Thermal modernisation of the Firlej Municipal Office building (Q105282)

From EU Knowledge Graph
Revision as of 11:16, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q105282 in Poland
Language Label Description Also known as
English
Thermal modernisation of the Firlej Municipal Office building
Project Q105282 in Poland

    Statements

    0 references
    798,595.08 zloty
    0 references
    191,662.82 Euro
    13 January 2020
    0 references
    939,523.63 zloty
    0 references
    225,485.67 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    7 January 2019
    0 references
    31 December 2021
    0 references
    GMINA FIRLEJ
    0 references
    0 references
    Celem głównym projektu jest Poprawa jakości środowiska naturalnego na terenie gminy Firlej poprzez termomodernizację budynku użyteczności publicznej. Realizacja projektu posłuży zmniejszeniu zapotrzebowania na energię cieplną i elektryczną. Ponadto przeprowadzenie procesu kompleksowej termomodernizacji przyczyni się do redukcji zanieczyszczenia powietrza atmosferycznego i poprawy jego czystości. Stanie się to dzięki zmniejszeniu emisji CO2 i innych gazów cieplarnianych oraz pyłów do atmosfery. W konsekwencji inwestycja poprawi komfort użytkowników budynku, zmniejszy koszty eksploatacji jak również przyczyni się do poprawy jakości środowiska naturalnego. Projekt obejmuje poprawę efektywności energetycznej budynku użyteczności publicznej poprzez m.in.: 1. Demontaż starej instalacji c.o. oraz wykonanie nowej poprzez wymianę rur c.o., grzejników, montaż zaworów odcinajacych, odpowietrzajacych,termostatycznych, pomp obiegowych oraz montaż liczników ciepła. W ramach prac przewidziano również wykonanie systemu zarządzania energią pozwalającą zmniejszyć ogrzewanie w części biurowej w godzinach popołudniowych i w dniach wolnych od pracy. Przewiduje się wykonanie montażu regulatora pokojowego, pompy obiegowej, zaworu trójdrogowego, montaż liczników ciepła. 2. Ocieplenie ścian zewnętrznych przy użyciu styropianu. 3. Ocieplenie stropu nieogrzewanego poddasza przy użyciu wełny mineralnej 6. Wymiana okien; 7. Wymiana drzwi; 8. Montaż instalacji fotowoltaicznej o mocy 3,36 kWp; 9. Wymiana oświetlenia na LED. W wyniku realizacji projektu nastąpi poprawa efektywności energetycznej obiektu o: a) 437,05 GJ energii cieplnej czyli 62,69%; b) 18,49 MWh energii elektrycznej czyli 45,70%; c) 503,79 GJ czyli 59,75%. W wyniku realizacji projektu nastąpi redukcja emisji CO2 o 74,84t (49,48%). Projekt przyczyni się również do redukcji emisji zanieczyszczeń SO2 i NOx, CH4, N20, CFC oraz NMVOCs a także Pm10 powyżej 30%. (Polish)
    0 references
    The main objective of the project is to improve the quality of the environment in the municipality of Firlej through the thermal modernisation of the public utility building. The implementation of the project will help reduce the demand for heat and electricity. In addition, a comprehensive thermal modernisation process will contribute to reducing atmospheric air pollution and improving its purity. This will be done by reducing emissions of CO2 and other greenhouse gases and dust into the atmosphere. As a result, the investment will improve the comfort of building users, reduce operating costs and improve the quality of the environment. The project includes improving the energy efficiency of a public utility building through, among others: 1. Disassembly of the old central heating system and making a new one by replacing central heating pipes, radiators, installation of shut-off valves, venting valves, thermostatic pumps, circulating pumps and assembling heat meters. The work also envisages the implementation of an energy management system that reduces heating in the office area in the afternoon and on public holidays. Installation of room regulator, circulation pump, three-way valve, installation of heat meters is envisaged. 2. Warming the outer walls with Styrofoam. 3. Warming of the floor of unheated attic with mineral wool 6. Window replacement; 7. Replacement of doors; 8. Installation of a 3,36 kWp photovoltaic installation; 9. Switching lighting to LEDs. As a result of the project, the energy efficiency of the facility will be improved by: 437,05 GJ of thermal energy or 62,69 %; 18,49 MWh of electricity or 45,70 %; 503,79 GJ or 59,75 %. The project will reduce CO2 emissions by 74.84 t (49.48 %). The project will also contribute to reducing emissions of SO2 and NOx, CH4, N20, CFC and NMVOCs as well as Pm10 above 30 %. (English)
    20 October 2020
    0 references

    Identifiers

    RPLU.05.02.00-06-0027/19
    0 references