THERMAL MODERNISATION OF PUBLIC UTILITY FACILITIES LOCATED IN THE MUNICIPALITY OF NOWOSOLNA (Q101881)

From EU Knowledge Graph
Revision as of 11:12, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q101881 in Poland
Language Label Description Also known as
English
THERMAL MODERNISATION OF PUBLIC UTILITY FACILITIES LOCATED IN THE MUNICIPALITY OF NOWOSOLNA
Project Q101881 in Poland

    Statements

    0 references
    874,916.25 zloty
    0 references
    209,979.9 Euro
    13 January 2020
    0 references
    1,420,088.05 zloty
    0 references
    340,821.13 Euro
    13 January 2020
    0 references
    61.61 percent
    0 references
    14 October 2016
    0 references
    30 November 2018
    0 references
    GMINA NOWOSOLNA
    0 references

    51°48'34.6"N, 19°38'42.0"E
    0 references
    Głównym celem projektu jest: Poprawa efektywności energetycznej w sektorze publicznym poprzez termomodernizację budynków użyteczności publicznej w gminie Nowosolna. Użytkownikami zmodernizowanej infrastruktury będą mieszkańcy gminy. Korzyści wynikające z osiągnięcia celów projektu związanych z poprawą efektywności energetycznej a tym samym związanych z jakością powietrza atmosferycznego wykraczać będą poza jej granice. Zakres rzeczowy inwestycji obejmuje termomodernizację trzech budynków użyteczności publicznej: Urząd Gminy Nowosolna: Wymiana stolarki okiennej i drzwiowej (zostało zrealizowane w 2016), wymiana stolarki okiennej w sali konferencyjnej (zostało zrealizowane w 2016), Modernizacja instalacji centralnego ogrzewania, Montaż instalacji odgromowej, Modernizacja systemu oświetlenia, Montaż instalacji fotowoltaicznej, Docieplenie budynku, Docieplenie stropów, Izolacja ścian fundamentowych, Modernizacja przegrody Dach, Roboty towarzyszące (prace demontażowe i przygotowawcze). OSP w Lipinach: Modernizacja systemu ciepłej wody użytkowej, Wymiana stolarki drzwiowej, Docieplenie ścian zewnętrznych, Modernizacja przegrody Dach, Modernizacja systemu grzewczego. OSP w Starych Skoszewach: Instalacja - montaż głowic termostatycznych i automatyki pogodowo-czasowej, Wymiana stolarki okiennej, Wymiana drzwi wejściowych, Docieplenie ścian zewnętrznych, Docieplenie stropodachu sali spotkań, Docieplenie stropodachu nad pozostałą częścią budynku, Modernizacja systemu oświetlenia. Projekt zakłada wzrost efektywności energetycznej o 63,98% (średnia dla wszystkich termomodernizowanych budynków), zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych (CO32) o 613 387,45 kWh/rok oraz szacowany roczny spadek emisji gazów cieplarnianych (CO34) kształtujący się na poziomie 100,15 tony równoważnika CO2/rok. (Polish)
    0 references
    The main objective of the project is to: Improve energy efficiency in the public sector through the thermal modernisation of public buildings in the municipality of Nowosolna. Users of modernised infrastructure will be local residents. The benefits of achieving the project’s objectives of improving energy efficiency and thus relating to ambient air quality will go beyond its limits. The material scope of the investment includes the thermal modernisation of three public buildings: The Municipality of Nowosolna: Replacement of window and door carpentry (was carried out in 2016), replacement of window joinery in the conference room (was completed in 2016), Modernisation of central heating system, installation of lightning system, Modernisation of lighting system, installation of photovoltaic installation, Building warming, Floor warming, Insulation of foundation walls, Modernisation of the Roof partition, accompanying works (dismantling and preparatory work). OSP in Lipina: Modernisation of hot water system, Replacement of door carpentry, insulation of external walls, Modernisation of the roof partition, Modernisation of heating system. OSP in Stary Skoszewy: Installation – installation of thermostatic heads and weather and time automation, Replacement of window joinery, Replacement of entrance doors, Warming of external walls, Warming of meeting room ceilings, warming of ceilings over the rest of the building, Modernisation of lighting system. The project assumes an increase in energy efficiency of 63.98 % (average for all thermomodernised buildings), reduction of annual primary energy consumption in public buildings (CO32) by 613387.45 kWh/year and an estimated annual reduction in greenhouse gas emissions (CO34) of 100.15 tonnes CO2/year. (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.04.02.01-10-0010/17
    0 references