CONSTRUCTION OF PROSUMER MICRO-INSTALLATIONS USING RENEWABLE ENERGY SOURCES IN THE MUNICIPALITY OF SŁUPIA (Q101795)

From EU Knowledge Graph
Revision as of 11:10, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q101795 in Poland
Language Label Description Also known as
English
CONSTRUCTION OF PROSUMER MICRO-INSTALLATIONS USING RENEWABLE ENERGY SOURCES IN THE MUNICIPALITY OF SŁUPIA
Project Q101795 in Poland

    Statements

    0 references
    787,368.94 zloty
    0 references
    188,968.55 Euro
    13 January 2020
    0 references
    996,669.55 zloty
    0 references
    239,200.69 Euro
    13 January 2020
    0 references
    79.0 percent
    0 references
    20 September 2016
    0 references
    30 November 2018
    0 references
    GMINA SŁUPIA
    0 references
    0 references

    51°51'20.9"N, 19°58'5.5"E
    0 references
    Beneficjentem projektu jest Jednostka Samorządu Terytorialnego – Gmina Słupia. Celem głównym projektu jest: Zwiększenie produkcji energii ze źródeł odnawialnych i zmniejszenie wykorzystania konwencjonalnych źródeł energii na terenie gminy Słupia, skutkujące poprawą stanu środowiska naturalnego w wyniku redukcji emisji zanieczyszczeń do atmosfery. Grupą docelową projektu są wszyscy mieszkańcy gminy Słupia, oraz pośrednio mieszkańcy regionu łódzkiego. Zakres rzeczowy projektu obejmuje: ? Instalacja pompy ciepła na potrzeby c.o. i c.w.u. – 1 budynek mieszkalny, moc grzewcza: min. 8,9 kW. ? Instalacje fotowoltaiczne – budynki mieszkalne, instalacja o mocy 3,08 kWp; liczba budynków.:10; instalacja o mocy 4,2 kWp; liczba budynków: 9; instalacja o mocy 5,04 kWp; liczba budynków: 9; instalacja o mocy 6,16 kWp; liczba budynków: 2; instalacja o mocy 9,8 kWp; liczba budynków: 1. Instalacje posadowione na dachu: 28 budynków. Instalacje posadowione na gruncie: 3 budynki ? Instalacje fotowoltaiczne – budynki gospodarcze, instalacja o mocy 3,08 kWp; liczba budynków.: 3; instalacja o mocy 4,2 kWp; liczba budynków: 1; instalacja o mocy 5,04 kWp; liczba budynków: 2; instalacja o mocy 7 kWp; liczba budynków: 1. Instalacje posadowione na dachu: 7 budynków. ? Instalacje fotowoltaiczne – budynki użyteczności publicznej; instalacja o mocy 4,2 kWp; liczba budynków.: 1; instalacja o mocy 20,16 kWp; liczba budynków: 2; instalacja o mocy 14,56 kWp; liczba budynków: 1.Instalacje posadowione na dachu: 3 budynki. Instalacje posadowione na gruncie: 1 budynek. Lokalizacja projektu obejmuje miejscowości: Słupia, Zagórze, Modła, Krosnowa, Nowa Krosnowa, Gzów, Wólka-Nazdroje, Winna Góra, Podłęcze, Marianów, Bonarów. Dzięki realizacji projektu redukcja emisji CO2 zostanie osiągnięta na poziomie 92,67%. (Polish)
    0 references
    The beneficiary of the project is the Local Government Unit – Słupia Municipality. The main objective of the project is to: Increasing the production of renewable energy sources and reducing the use of conventional energy sources in the municipality of Słupia, resulting in an improvement in the environment as a result of reducing emissions of pollutants into the atmosphere. The target group of the project is all residents of the municipality of Słupia, and indirectly residents of the Łódź region. The project’s material scope includes: ? Heat pump installation for central heating and hot water – 1 residential building, heating capacity: min. 8,9 kW. ? Photovoltaic installations – residential buildings, installation with a power of 3,08 kWp; number of buildings.:10; an installation with a power of 4,2 kWp; number of buildings: 9. an installation with a power of 5,04 kWp; number of buildings: 9. an installation with a power of 6,16 kWp; number of buildings: 2. an installation with a power of 9,8 kWp; number of buildings: 1. Roof-mounted installations: It’s 28 buildings. Installations located on the ground: 3 buildings? – Yeah. Photovoltaic installations – outbuildings, installation with a capacity of 3,08 kWp; number of buildings: 3. an installation with a power of 4,2 kWp; number of buildings: 1. an installation with a power of 5,04 kWp; number of buildings: 2. an installation with a power of 7 kWp; number of buildings: 1. Roof-mounted installations: It’s 7 buildings. ? Photovoltaic installations – public utility buildings; an installation with a power of 4,2 kWp; number of buildings: 1. an installation with a power of 20,16 kWp; number of buildings: 2. an installation with a power of 14,56 kWp; number of buildings: 1.Roof-mounted installations: It’s 3 buildings. Installations located on the ground: 1st building. The location of the project includes the following towns: Słupia, Zagórze, Prayer, Krosnowa, Nowa Krosnowa, Gzów, Wólka-Nazdroje, Winna Góra, Podłęcze, Marianów, Bonarów. With the implementation of the project, the reduction of CO2 emissions will be reached at 92.67 %. (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.04.01.02-10-0105/16
    0 references