“Distribution of natural and recreational resources in Żara” (Q100430)

From EU Knowledge Graph
Revision as of 11:03, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q100430 in Poland
Language Label Description Also known as
English
“Distribution of natural and recreational resources in Żara”
Project Q100430 in Poland

    Statements

    0 references
    818,220.32 zloty
    0 references
    196,372.88 Euro
    13 January 2020
    0 references
    962,612.16 zloty
    0 references
    231,026.92 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    22 June 2016
    0 references
    30 September 2018
    0 references
    GMINA ŻARY O STATUSIE MIEJSKIM
    0 references
    0 references

    51°37'27.8"N, 15°8'55.3"E
    0 references
    Główną osią projektu jest zagospodarowanie w celu ochrony przyrody oraz racjonalne udostępnienie jako miejsca rekreacji terenu parku w rejonie ul. Czerwonego Krzyża i Paderewskiego w Żarach. Projekt jako całość ukierunkowany jest na zagospodarowanie zaniedbanego obszaru zielonego, charakteryzującego się wysoką bioróżnorodnością tak, aby pełnił on rolę miejsca atrakcyjnego zarówno pod względem przyrod., jak i rekreacyjnym. W ten sposób połączone zostaną w nim funkcje ochrony przyrody (zachowanie biolog. różnorodności obszaru) oraz funkcje rekreacyjne dla mieszkańców, uzyskane dzięki uporządkowaniu terenu. Na wiązkę celów projektu składają się: 1. Uporządkowanie terenu w rejonie ul. Czerwonego Krzyża i Paderewskiego w Żarach (cel główny określony na poziomie produktu). 2. Wykorzystanie parku do pełnienia funkcji edukacyjnych (poziom rezultatu), 3. Wzmocnienie funkcji siedliskowej parku (poziom rezultatu), 4. Udostępnienie parku jako miejsca rekreacji (poziom rezultatu), 5. Uporządkowanie ruchu odwiedzających (poziom rezultatu), 6. Zwiększenie ilości terenów rekreacyjnych w Żarach (poziom rezultatu), 7. Ochrona gatunków ptaków i nietoperzy bytujących w parku i w mieście (poziom rezultatu długofalowego). Przedsięwzięcie zostanie przeprowadzone z podziałem na 6 zadań: 1. Zadanie nr 1 - roboty budowlane, 2. Zadanie nr 2 - nadzór inwestorski, 3. Zadanie nr 3 - dostawa i montaż tablic ścieżki dydaktyczne, 4. Zadanie nr 4 - dostawa i montaż budek lęgowych, 5. Zadanie nr 5 - promocja projektu, 6. Zadanie nr 6 - wydatki na przygotowanie projektu. Ponieważ wybudowana infrastruktura będzie miała charakter ogólnodostępny i nieodpłatny, zatem korzystać z niej będą mogli wszyscy chętni tj. mieszkańcy Żar i osoby odwiedzające Żary, w tym osoby niepełnosprawne. Efektem przeds. będzie osiągnięcie wskaźników adekwatnych dla realizowanych w ramach projektu działań, które zostały określone i scharakteryzowane (poprzez wskazanie mierzalnych wielkości) w sekcji C wniosku o (Polish)
    0 references
    The main axis of the project is the development of nature conservation and rational provision as a place for recreation of the park area in the area of ul. Red Cross and Paderewski in Żary. The project as a whole is aimed at developing a neglected green area characterised by high biodiversity so that it is an attractive place for both nature and recreation. In this way, it will combine the functions of nature conservation (biological conservation. diversity of the area) and recreational functions for residents, obtained by ordering the terrain. The beam of the project’s objectives shall consist of: 1. Ordering the area in the area of ul. Red Cross and Paderewski in Żary (main target defined at product level). 2. Use of the park to perform educational functions (result level), 3. Enhancement of the park’s habitat function (result level), 4. Making the park available as a recreational area (result level), 5. Ordering the visitor traffic (result level), 6. Increase in the number of recreational areas in Żara (result level), 7. Protection of bird species and bats living in the park and in the city (long-term result level). The project will be divided into 6 tasks: 1. Task 1 – construction work, 2. Task No. 2 – investor supervision, 3. Task No. 3 – delivery and installation of educational path boards, 4. Task No. 4 – delivery and installation of breeding booths, 5. Task No. 5 – Project promotion, 6. Task No. 6 – expenditure on the preparation of the project. Since the built infrastructure will be open and free of charge, all those interested, i.e. residents of Żar and those visiting Żara, including persons with disabilities, will be able to use it. The result will be the achievement of indicators adequate for the actions carried out under the project, which have been identified and characterised (by indicating the measurable figures) in Section C of the application (English)
    17 October 2020
    0 references

    Identifiers

    RPLB.04.05.01-08-0003/17
    0 references