THERMAL MODERNISATION OF THE BUILDING AND THE USE OF RES IN MARPOL (Q105131)

From EU Knowledge Graph
Revision as of 10:57, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q105131 in Poland
Language Label Description Also known as
English
THERMAL MODERNISATION OF THE BUILDING AND THE USE OF RES IN MARPOL
Project Q105131 in Poland

    Statements

    0 references
    142,576.98 zloty
    0 references
    34,218.48 Euro
    13 January 2020
    0 references
    219,349.26 zloty
    0 references
    52,643.82 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    2 May 2019
    0 references
    30 November 2019
    0 references
    KUDŁO JERZY "MARPOL"
    0 references
    0 references
    W ramach wskazanego wariantu przedsięwzięcia termomodernizacyjnego wykonane zostaną następujące prace: - wymiana instalacji c.o. : zastosowanie termozaworów grzejnikowych o czułości 1°K z możliwością zdalnego sterowania nastawami , montaż nowych grzejników , wymiana źródła ciepła z pieca węglowego na kocioł opalany biomasa o mocy ok 25 kW . Instalacja zostanie wyposażona w ciepłomierz a kocioł w programator harmonogramu pracy. - wymiana oświetlenia na oprawy LED - ok 11 szt - wykonanie instalacji fotowoltaicznej o mocy 10 kW i powierzchni absorbera co najmniej 66 m2 - ocieplenie ścian styropianem o współ.?=0,032 i grubości 15 cm . Do wykonania ok 100,92 m2. - docieplenie ścian ocieplonych styropianem EPS 70 40 grubości 10 cm styropianem o współ.?=0,032 i grubości 5 cm . Do wykonania ok 95,93 m2. - ocieplenie stropodachu płytą warstwową z rdzeniem PUR lub PIR o współ.?=0,025 i grubości 16 cm . Do wykonania ok 417,82 m2. - modernizacja instalacji c.w.u. - włączenie nowego zasobnika c.w.u. o poj 100 l do z kotła na biomasę . Zasobnik będzie wyposażony w grzałkę elektryczną zasilaną z instalacji fotowoltaicznej po sezonie grzewczym. Zamontowanie licznika ciepła na wyjściu z zasobnika oraz wodomierza na dopuszczeniu zimnej wody - wymiana bram na bramy segmentowe , podnoszone o współcz. U co najmniej równym 1,3 W/m2K . Do wykonania ok. 45 m2. - Zamontowanie boczkarki o mocy do 4 kW. Realizacja projektu poprzez montaż kotła na biomasę, montaż instalacji fotowolt.oraz oświetlenia energooszczęd. przyczyni się do redukcji emisji C02 do atmosfery. W wyniku osiągnięte zostaną następujące m.in. wskaźniki: - Ilość zaoszczędzonej energii cieplnej - 158,97GJ (41,26 %), - Ilość zaoszczędzonej energii elektrycznej - 108,97 GJ (30,27 MWh; 104,3 %), - Zmniejszenie zużycia energii końcowej - 267,94 GJ (54,7%), - Zmniejszenie emisji CO2 - 69542 kg/rok (100%) - Zmniejszenie emisji PM-10 - 283,85 kg/rok (97,36%) (Polish)
    0 references
    The following works will be carried out within this option of the thermo-modernisation project: — replacement of central heating installations: use of heater valves with a sensitivity of 1°K with the possibility of remote control of settings, installation of new radiators, replacement of heat source from coal furnace to boiler-fired biomass with a power of about 25 kW. The installation will be equipped with a heat meter and a boiler with a timetable programmer. — replacement of lighting for LED luminaires – approx. 11 pcs – production of photovoltaic installation with a power of 10 kW and absorber surface of at least 66 m² – insulation of the walls with styrofoam joint?=0.032 and thickness of 15 cm. Approx. 100.92 m² to be made. — insulation of walls with Styrofoam EPS 70 40 thickness 10 cm Styrofoam with joint.?=0,032 and thickness of 5 cm. Approx. 95.93 m² to be made. — warming of the ceiling with a layer plate with a PUR core or PIR co.?=0.025 and a thickness of 16 cm. Approx. 417.82 m² to be made. — modernisation of the central heating system – incorporation of a new storage tank with a capacity of 100 litres into the biomass boiler. The tray will be equipped with an electric heater powered from a photovoltaic installation after the heating season. Installation of a heat counter on the exit of the reservoir and water meter on the release of cold water – replacement of gates for segment gates, raised by compassion. At least 1,3 W/m2K. It’s okay to do it. 45 m². — Mounting of bacon with power up to 4 kW. The implementation of the project through the installation of a biomass boiler, installation of photovolts. and energy-saving lighting will contribute to reducing C02 emissions into the atmosphere. As a result, the following indicators will be achieved: — The amount of thermal energy saved – 158,97GJ (41.26 %), – The amount of electricity saved – 108.97 GJ (30.27 MWh; 104.3 %), – Reduction of final energy consumption – 267.94 GJ (54.7 %), – Reduction of CO2-69542 kg/year (100 %) – Reduction of PM-10-283.85 kg/year (97.36 %) (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.05.01.00-06-0072/18
    0 references