CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT IN THE MUNICIPALITY OF SŁAWNO IN KUNICE, PRYMUSOWA WILL, STONE AND CAUTIOUS (Q102022)
Jump to navigation
Jump to search
Project Q102022 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT IN THE MUNICIPALITY OF SŁAWNO IN KUNICE, PRYMUSOWA WILL, STONE AND CAUTIOUS |
Project Q102022 in Poland |
Statements
476,780.67 zloty
0 references
561,579.12 zloty
0 references
84.9 percent
0 references
1 February 2019
0 references
20 December 2019
0 references
GMINA SŁAWNO
0 references
PROJEKT POLEGA NA BUDOWIE OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH ZGODNIE Z KONCEPCJĄ PROJEKTOWANIA UNIWERSALNEGO WG WYTYCZNYCH FU 2014-2020 NA ODCINKACH: • KUNICE: 26 PUNKTÓW ŚWIETLNYCH Z OPRAWAMI TYPU LED • PRYMUSOWA WOLA: 28 PUNKTY ŚWIETLNE Z OPRAWAMI TYPU LED I 2 SZT. ZNAKÓW AKTYWNYCH ZASILANYCH Z MODUŁU FOTOWOLTAICZNEGO • KAMIEŃ: 62 PUNKTÓW ŚWIETLNYCH Z OPRAWAMI TYPU LED • OSTROŻNA: 4 PUNKTY ŚWIETLNE Z OPRAWAMI TYPU LED ŁĄCZNIE WYBUDOWANE ZOSTANĄ 120 PUNKTÓW ŚWIETLNYCH Z OPRAWAMI TYPU LED ORAZ 2 ZNAKI AKTYWNE ZASILANE Z MODUŁU FOTOWOLTAICZNEGO (OZE) PLANOWANA INWESTYCJA JEST ELEMENTEM SZERSZEGO PROJEKTU INFRASTRUKTURALNEGO, RÓWNOLEGLE REALIZOWANEGO I FINANSOWANEGO PRZEZ BENEFICJENTA – WIĘCEJ W PKT. 6.6 WOD. OBECNE WYSOKIE KOSZTY OŚWIETLANIA MIEJSC UŻYTECZNOŚCI PUBLICZNEJ: • GENERUJĄ WYSOKIE KOSZTY OŚWIETLANIA • ZWIĘKSZAJĄ ZANIECZYSZCZANIE ŚRODOWISKA • WYSOKIE KOSZTY OŚWIETLANIA POWODUJĄ, IŻ NIE WZRASTA PROPORCJONALNIE DO POTRZEB LICZBA NOWYCH INWESTYCJI • ZWIĄZANE SĄ Z NIEWYKORZYSTANIEM SYSTEMÓW ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH (OZE). ZADANIA: 1. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH W MIEJSCOWOŚCI KUNICE. 2. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH W MIEJSCOWOŚCI PRYMUSOWA WOLA. 3. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH W MIEJSCOWOŚCI KAMIEŃ. 4. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH W MIEJSCOWOŚCI OSTROŻNA. 5. PROMOCJA PROJEKTU. 6. NADZÓR INWESTORSKI. 7. PRZYŁĄCZENIE DO SIECI DYSTRYBUCYJNEJ PGE SZCZEGÓŁOWE WYMAGANIA TECHNICZ. ZNAJDUJĄ SIĘ W SW ROZ. 4 ORAZ W ZAŁ. 3. CELE: DZIĘKI REALIZACJI PROJEKTU SPEŁNIONY ZOSTANIE CEL GŁÓWNY PROJEKTU TJ. ZWIĘKSZANIE OSZCZĘDNOŚCI ENERGII ORAZ POPRAWA CZYSTOŚCI POWIETRZA W GMINIE SŁAWNO. GRUPA DOCELOWA: BEZPOŚREDNIA: MIESZKAŃCY GMINY SŁAWNO, OSOBY PRZEJEZDNE, KORZYSTAJĄCE Z INFRASTRUKTURY P (Polish)
0 references
THE PROJECT CONSISTS OF THE CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT ACCORDING TO THE CONCEPT OF UNIVERSAL DESIGN ACCORDING TO FU 2014-2020 GUIDELINES ON SECTIONS: • KUNICE: 26 LIGHT POINTS WITH LED LUMINAIRES • PRIMUS WILL: 28 LIGHT POINTS WITH LED LUMINAIRES AND 2 PCS. ACTIVE CHARACTERS POWERED BY PHOTOVOLTAIC MODULE • STONE: 62 LIGHT POINTS WITH LED LUMINAIRES • CAUTIOUS: 4 LIGHT POINTS WITH LED LUMINAIRES WILL BE BUILT IN TOTAL 120 LIGHT POINTS WITH LED LUMINAIRES AND 2 ACTIVE SIGNS POWERED FROM THE PHOTOVOLTAIC MODULE (RES) THE PLANNED INVESTMENT IS PART OF A WIDER INFRASTRUCTURE PROJECT, SIMULTANEOUSLY IMPLEMENTED AND FINANCED BY THE BENEFICIARY – MORE IN POINT. 6,6 WATER. CURRENT HIGH COSTS FOR LIGHTING PUBLIC PLACES: • GENERATE HIGH LIGHTING COSTS • INCREASE POLLUTION • HIGH LIGHTING COSTS CAUSE THAT THE NUMBER OF NEW INVESTMENTS DOES NOT INCREASE IN PROPORTION TO THE NEEDS • ARE RELATED TO THE UNUSED ENERGY-EFFICIENT AND ENVIRONMENTALLY FRIENDLY SYSTEMS (RES). TASKS: 1. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE TOWN OF KUNICE. 2. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT IN THE VILLAGE OF PRYMUSOWA WILL. 3. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE TOWN STONE. 4. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE LOCALITY CAUTIOUS. 5. PROMOTION OF THE PROJECT. 6. IT’S INVESTOR SUPERVISION. 7. CONNECTION TO THE PGE DISTRIBUTION NETWORK DETAILED TECHNICAL REQUIREMENTS. THEY'RE IN SW ROZ. 4 AND. 3. OBJECTIVES: THROUGH THE IMPLEMENTATION OF THE PROJECT, THE MAIN OBJECTIVE OF THE PROJECT WILL BE MET, I.E. INCREASING ENERGY SAVINGS AND IMPROVING AIR PURITY IN THE MUNICIPALITY OF SŁAWNO. TARGET GROUP: DIRECT: RESIDENTS OF THE MUNICIPALITY OF SŁAWNO, PASSIVE PERSONS, USING P INFRASTRUCTURE (English)
17 October 2020
0 references
Identifiers
RPLD.04.03.02-10-0023/18
0 references