Thermal modernisation of the primary school in Małki with expansion and extension and modernisation of the existing boiler room (Q98237)

From EU Knowledge Graph
Revision as of 10:35, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q98237 in Poland
Language Label Description Also known as
English
Thermal modernisation of the primary school in Małki with expansion and extension and modernisation of the existing boiler room
Project Q98237 in Poland

    Statements

    0 references
    385,469.87 zloty
    0 references
    92,512.77 Euro
    13 January 2020
    0 references
    550,671.25 zloty
    0 references
    132,161.1 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    1 January 2018
    0 references
    31 October 2018
    0 references
    GMINA BOBROWO
    0 references
    0 references
    Przedmiotem projektu są prace termomodernizacyjne, którym poddany zostanie 1 obiekt budowlany użyteczności publicznej zlokalizowany na terenie Gminy Bobrowo - Budynek Szkoły Podstawowej w skład którego wchodzi biblioteka i sala gimnastyczna w miejscowości Małki. Projekt będzie realizowany w miejscowości Małki, 87-325 Małki. Głównym problemem, jaki został zidentyfikowany w budynku jest przede wszystkim nieefektywne wykorzystywanie energii cieplnej, co przejawia się w wysokich kosztach eksploatacyjnych oraz znacznej emisji substancji szkodliwych dla środowiska. Głównym celem realizacji projektu jest ograniczenie strat ciepła i ekonomiczne wykorzystanie energii cieplnej poprzez termomodernizację do której należy: dociep. stropu pod nieogrzewanym strychem, stropodachu oraz ścian zewnętrznych obiektu (bez pomieszczeń świetlicy), wymiana okien w sali gimnastycznej oraz wymiana źródła ciepła. Szczegółowy zakres znajduje się w SW i C.2 Wn. oraz dok.projekt. Prace termomodernizacyjne planowane są na II i III kw.2018 r.nie później jednak niż do dnia 31.10.2018r. Projekt realizowany jest na obiekcie budowlanym składający się z pomieszczeń szkoły podstawowej, sali gimnastycznej, biblioteki i świetlicy wiejskiej. (Polish)
    0 references
    The subject of the project is thermal modernisation works, which will undergo 1 public utility building located in the Bobrowo – Primary School Municipality, which consists of a library and gymnastics room in the town of Małki. The project will be implemented in Małki, 87-325 Małki. The main problem identified in the building is, above all, the inefficient use of heat, which is reflected in high operating costs and significant emissions of environmentally harmful substances. The main objective of the project is to reduce heat losses and the economic use of thermal energy through thermal modernisation, which includes: cover the ceiling under unheated attic, ceiling and exterior walls of the object (without common room), replacement of windows in the gym and replacement of heat source. Detailed scope is available in SW and C.2 Wn. and dok.project. Thermal retrofitting is planned for the second and third quarters of 2018 but not later than 31.10.2018. The project is carried out on a building building consisting of the premises of an elementary school, a gymnasium, a library and a rural common room. (English)
    17 October 2020
    0 references

    Identifiers

    RPKP.03.03.00-04-0067/16
    0 references