Revitalisation of the building at ul. 1 May 83 in Wałbrzych (Q96263)

From EU Knowledge Graph
Revision as of 09:36, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q96263 in Poland
Language Label Description Also known as
English
Revitalisation of the building at ul. 1 May 83 in Wałbrzych
Project Q96263 in Poland

    Statements

    0 references
    458,230.38 zloty
    0 references
    109,975.29 Euro
    13 January 2020
    0 references
    611,055.31 zloty
    0 references
    146,653.27 Euro
    13 January 2020
    0 references
    74.99 percent
    0 references
    23 December 2016
    0 references
    31 July 2019
    0 references
    WSPÓLNOTA MIESZKANIOWA PRZY UL. 1 MAJA 83 W WAŁBRZYCHU
    0 references
    0 references
    Przedmiotem projektu jest przeprowadzenie działań mających na celu poprawę stanu technicznego budynku znajdujące się w Wałbrzychu na ul. 1 Maja 83. W chwili obecnej stan budynku jest zły, zgodnie z przeglądem technicznym zużycie techniczne obiektu wynosi 54,12%. Wpływa to bardzo negatywnie na wygląd całego miasta, jego atrakcyjność inwestycyjną i turystyczną oraz ogólne warunki życia na obszarze zdegradowanym. Postępująca degradacja infrastruktury technicznej miasta wywołuje ogólne zniechęcenie, poczucie wykluczenia społecznego i kumulacje środowisk patogennych wśród jego mieszkańców. Inwestycja realizowana będzie w oparciu o zadania związane z: - dokumentacją projektu (w tym studium wykonalności) - pracami budowlanymi (prace związane z rewitalizacją oraz udogodnienia dla osób niepełnosprawnych), - informacją i promocją - nadzorem inwestorskim - zarządzaniem projektem. Projekt realizowany będzie samodzielnie. Beneficjentem, Operatorem i Inwestorem projektu jest Wspólnota Mieszkaniowa przy ul. 1 Maja 83 w Wałbrzychu. Grupą docelową przedmiot. projektu są mieszkańcy miasta Wałbrzych, a z rezultatów projektu skorzystają przede wszystkim mieszkańcy budynku przy ul. 1 Maja 83 w Wałbrzychu, który poddany zostanie rewitalizacji. Lokatorzy budynku zamieszkują łącznie 19 mieszkań. W projekcie występują koszty niekwalifikowane ze względu na powierzchnie użytkową w budynku. Koszty kwalifikowalności wydatków zostały proporcjonalnie obcięte. Zgodnie z Wytycznymi trwałość projektu zostanie zachowana przez okres minimum 5 lat od momentu rozliczenia projektu. Realizacja projektu pozwoli na realizację założonych celów Gminnego Programu Rewitalizacji dla Miasta Wałbrzych na lata 2016-2025, jak również umożliwi likwidację zidentyfikowanych problemów występ. na tym obszarze. Zrealizowanie projektu przyczyni się do: poprawy stanu technicznego budynku, wzrostu jakości życia mieszkańców, wyhamowania patologii i wykluczeń, rozwoju i wzmocnienia więzi lokalnych (widoczny char (Polish)
    0 references
    The object of the project is to carry out activities aimed at improving the technical condition of the building located in Wałbrzych on ul. May 1, 83. Currently, the building’s condition is poor, according to the technical review, the technical use of the facility is 54.12 %. This has a very negative impact on the appearance of the whole city, its investment and tourist attractiveness and general living conditions in the degraded area. The progressive degradation of the city’s technical infrastructure creates a general discouragement, a sense of social exclusion and the accumulation of pathogenic environments among its inhabitants. The investment will be carried out on the basis of tasks related to: — project documentation (including feasibility study) – construction work (work related to revitalisation and facilities for people with disabilities), – information and promotion – investor supervision – project management. The project will be implemented on its own. The beneficiary, Operator and Investor of the project is the Housing Community on ul. 1 May 83 in Wałbrzych. The target group of the project is residents of the city of Wałbrzych, and the results of the project will benefit mainly residents of the building at ul. 1 May 83 in Wałbrzych, which will be revitalised. The tenants of the building have a total of 19 apartments. In the project there are ineligible costs due to the usable space in the building. The costs of eligibility of expenditure have been proportionately cut. According to the Guidelines, the sustainability of the project will be maintained for a minimum period of 5 years from the date of settlement of the project. The implementation of the project will allow the realisation of the established objectives of the Municipal Regeneration Programme for the City of Wałbrzych for the years 2016-2025, as well as the elimination of the problems identified in this area. The implementation of the project will contribute to: improving the technical condition of the building, increasing the quality of life of residents, curbing pathology and exclusions, developing and strengthening local ties (visible char (English)
    16 October 2020
    0 references

    Identifiers

    RPDS.06.03.04-02-0016/16
    0 references