High-quality traineeships for future engineers – energy and electricians (Q92500)

From EU Knowledge Graph
Revision as of 08:02, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q92500 in Poland
Language Label Description Also known as
English
High-quality traineeships for future engineers – energy and electricians
Project Q92500 in Poland

    Statements

    0 references
    1,484,781.33 zloty
    0 references
    356,347.52 Euro
    13 January 2020
    0 references
    1,761,724.41 zloty
    0 references
    422,813.86 Euro
    13 January 2020
    0 references
    84.28 percent
    0 references
    1 April 2017
    0 references
    30 November 2018
    0 references
    POLITECHNIKA KRAKOWSKA IM. TADEUSZA KOŚCIUSZKI
    0 references
    0 references
    Projekt dotyczy  wysokiej jak. progr. staży 3 miesięczn. w ramach podnoszenia kompetencji,odpowiadających potrzebom gospodarki, rynku pracy i społeczeństwa. przez studentów/tki  na międzyw. kierunku Energetyka oraz kier. Elektrotechnika PK w trakcie 6 (przedost.) semestru  studiów stacjon. I stopnia. Okres proj. to 20 mies. od 1.04. 2017 roku do 30.11.2018 r. (KD4). Międzywydz. kier. eneregetyka jest prowadzony na Wydz. Mech. (WM) PK oraz na Wydz. Inżynierii Elektrycznej i Komputerowej (WIEiK) PK, oba te wydziały na dzień złożenia wniosku spełniają warunki pozwalające na prowadz. studiów stacjon. I stopnia ne kier. Energetyka oraz spełniają wymagania odnośnie poziomu kształc. wskazane w PSzW i aktach wykonawczych do tej ustawy, kier. Elektrotechnika jest prowadz. na WIEiK, wydział ten na dzień złożenia wniosku spełnia warunki na prowadz. studiów stacjon. I stopnia na kier. Elektrotechnika oraz spełnia wymag. odnośnie poziomu kształcenia wskazane w PSzW i w aktach wykonawczych do tej ustawy (KD2). Przyjęto w projekcie, że wszystkie staże będą 3 miesięczne (KRPREM1) ((70 staży w roku 2017 i 66 staży w roku 2018), wymiar stażu w jednym miesiącu będzie wynosił co najmniej 120 godzin wykonyw. zadań stażowych (KD5). Stażem zostanie objętych co najmniej 30 % studentów/tek studiujących na danym roku (trzecim) na kierunku energetyka i kierunku elektrotechnika objętych projektem (KD11). Kierunki studiów energetyka i elektrotechnika nieposiadają negatywnej oceny jakości kształcenia PKA (KD3). Założona wartość projektu jest mniejsza od 2 mln zł, co w odniesieniu do ilości kształconych na PK studentów - ponad 12000 spełnia(KD1,6). Wartośćśredniego kosztu na jednego studenta jest mniejsza od 15000 zł (KD7). Przy realizacji projektu zostaną uwzględnione wytyczne zawarte w zaleceniu Rady z dnia 10 marca 2014 r. w sprawie ram jakości staży (2014/C 88/01 (KD12). PK posiada ocenę wyrożniającą PKA na kier. architektura (KRPREM.3).Staże są realizowane poza progr.  studiów (KD9 (Polish)
    0 references
    The project concerns high-quality internships of 3 months in the framework of raising competences, responding to the needs of the economy, the labour market and society. by students/students in the inter-directional direction of Energy and Hearts. Electrical engineering PK during the course of the 6th (preost) Semester of the Stacjon Study. And a degree. The project period is 20 months from 1.04. 2017 until 30.11.2018 (KD4). Interdisciplinary eneregetics is run at the Department. It’s a moss. (WM) PK and Wydz. Electrical and Computer Engineering (WIEiK) PK, both of these departments on the day of submission of the application meet the conditions for conducting the Statutory Studies. And the degree of heart. The energy industry and meet the requirements regarding the level of education specified in the PSZW and the implementing acts of this law, hearts. Electrical engineering is led. on WIEiK, this department on the day of submission of the application meets the conditions for conducting. And a degree to the heart. Electrical engineering meets the level of education specified in the PSZW and the implementing acts of this Act (KD2). The project assumes that all traineeships will be 3 months (KRPREM1) (70 traineeships in 2017 and 66 in 2018), the duration of the internship in one month will be at least 120 hours of internships (KD5). The traineeship will cover at least 30 % of students/students for a given year (third) in the field of energy and electrical engineering covered by the project (KD11). The courses in energy and electrical engineering do not have a negative assessment of the quality of education PKA (KD3). The estimated value of the project is less than PLN 2 million, which in relation to the number of students trained for PK – more than 12000 meets (KD1,6). The average cost per student is less than PLN 15000 (KD7). The project will take into account the guidelines set out in the Council Recommendation of 10 March 2014 on a quality framework for traineeships (2014/C 88/01 (DD12). PK has a differentiation assessment of the PKA for the direction of architecture (KRPREM.3).The internships are carried out outside the threshold.Studies (KD9) (English)
    15 October 2020
    0 references

    Identifiers

    POWR.03.01.00-00-S074/15
    0 references