Increasing the sustainability of ecological corridors in the Parseta Basin (Q85562)

From EU Knowledge Graph
Revision as of 06:16, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q85562 in Poland
Language Label Description Also known as
English
Increasing the sustainability of ecological corridors in the Parseta Basin
Project Q85562 in Poland

    Statements

    0 references
    5,055,366.5 zloty
    0 references
    1,213,287.96 Euro
    13 January 2020
    0 references
    5,947,490.0 zloty
    0 references
    1,427,397.60 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 October 2017
    0 references
    31 December 2020
    0 references
    ZWIĄZEK MIAST I GMIN DORZECZA PARSĘTY
    0 references
    0 references
    0 references

    53°43'13.1"N, 16°40'45.1"E
    0 references

    53°44'15.4"N, 16°33'34.6"E
    0 references
    Celem projektu jest wzrost bioróżnorodności poprzez przywrócenie morfologicznej ciągłości wodnych korytarzy ekologicznych na 3 dopływach rzeki Parsęty: Raduszy, Gęsiej i Perznicy. Realizacja projektu umożliwi likwidację barier, które tworzy istniejąca infrastruktura oraz zapewni warunki do swobodnego przemieszczania się gatunków ryb i minogów na SOOS Natura 2000 Dorzecze Parsęty PLH320007. Udrożnienie korytarza ekol. odbędzie się poprzez dostosowanie budowli hydrotechnicznych do ekologii migrujących gat.: minoga rzecznego, minoga strumieniowego, łososia atlantyckiego, głowacza białopłetwego i kozy. Dorzecze Parsęty stanowi w miarę spójny ekosystem, jednak na przestrzeni wielu lat liczne bud. hydrotechn. spowodowały znaczne zmniejszenie się różnorodności biol. utrudniając lub całkowicie uniemożliwiając dotarcie rybom na tarliska. Mimo występowania dogodnych, naturalnych miejsc tarliskowych (w szcz. na Gęsiej, Raduszy i Perznicy)dostęp do nich jest mocno utrudniony, a w niektórych przypadkach wręcz niemożliwy. Gł. elementy projektu: 1. Przygotowanie dok. techn. dot. przebudowy infrastruktury hydrotechnicznej. 2.Przebudowa urządzeń infrastr. hydrotechnicznej zapewniającej swobodną migrację ryb i minogów (przywrócenie ciągłości na rzekach Perznica, Radusza i Gęsia). Likwidacja 14 stopni, 5 zastawek i 1 jazu. Budowa 47 bystrzy, ustabilizowanie dna, narzut kamienny z profilowaniem spadku, ścianki szczelne przeciwfiltracyjne, wbudowanie substratu żwirowego. 3.Aktywna ochrona siedlisk (walka z kłusownictwem, ogr. presji wędkarskiej 4.Przeprowadzenie badań dotyczących osiągniętych efektów ekol 5.Informacja i promocja projektu 6.Zarządzanie projektem (Polish)
    0 references
    The aim of the project is to increase biodiversity by restoring morphological continuity of ecological corridors on 3 tributaries of the Parseta river: Radusha, Goose and Perznica. Implementation of the project will make it possible to remove barriers created by existing infrastructure and will ensure the conditions for the free movement of fish and minog species onto SOOS Natura 2000 Parsęty basin PLH320007. The clearance of the ecological corridor will take place by adapting hydrotechnical structures to the ecology of migratory gat.: river fly, stream fly, Atlantic salmon, whitefin head and goat. The Parsêta basin is a relatively coherent ecosystem, but over many years, numerous hydrotechnology buildings have significantly reduced the diversity of biols, making it difficult or completely impossible for fish to reach spawning grounds. Despite the presence of convenient, natural spawning sites (especially on Goose, Radusza and Perznica) access to them is very difficult, and in some cases impossible. Main elements of the project: 1. Preparation of doc. techn. for the reconstruction of hydro-technical infrastructure. 2.Reconstruction of hydrotechnical infrastr. equipment ensuring free migration of fish and minogs (restore continuity on the rivers Perznica, Radusz and Goose). Decommissioning 14 degrees, 5 valves, and 1 cavity. Structure 47 sharp, stabilised bottom, stone overhead with drop profiling, waterproof walls, incorporation of gravel substrate. 3.Active habitat protection (fighting poaching, fishing pressure ogre 4.Conducting research on the results achieved by Ekol 5.Information and promotion of the project 6.Project management (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.04.00-00-0033/17
    0 references