Economic and environmental rationalisation of the sewage treatment system in the municipality of Mielno – stage I – reconstruction and expansion of the sewage treatment plant in Uni¶cie. (Q85279)

From EU Knowledge Graph
Revision as of 06:13, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q85279 in Poland
Language Label Description Also known as
English
Economic and environmental rationalisation of the sewage treatment system in the municipality of Mielno – stage I – reconstruction and expansion of the sewage treatment plant in Uni¶cie.
Project Q85279 in Poland

    Statements

    0 references
    12,774,161.25 zloty
    0 references
    3,065,798.70 Euro
    13 January 2020
    0 references
    15,028,425.0 zloty
    0 references
    3,606,822.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    30 September 2019
    0 references
    EKOPRZEDSIĘBIORSTWO SP. Z O.O.
    0 references
    0 references
    0 references
    Celem realizacji projektu jest ochrona środowiska naturalnego i uporządkowanie gospodarki ściekowej w aglomeracji Mielno w wyniku przebudowy i rozbudowy oczyszczalni ścieków w Unieściu, Objęta projektem oczyszczalnia ścieków jest zlokalizowana w woj. zachodniopomorskim, na mierzei między Jeziorem Jamno a Morzem Bałtyckim. Oczyszczalnia ścieków w Unieściu jest mechaniczno-biologiczną oczyszczalnią z podwyższonym usuwaniem związków azotu i fosforu. Oczyszczalnia będzie docelowo oczyszczała ścieki komunalne z całej aglomeracji Mielno oraz ścieki z obszaru agl. Sarbinowo. W agl. Mielno równoważna liczba mieszkańców wynosi 25.674 RLM. Oczyszczalnia jest wymiarowana na podstawie prognozy doprowadzonych ilości ścieków i ładunków zanieczyszczeń również z obszaru agl. Sarbinowo. W ramach projektu zaprojektowano przebudowę i rozbudowę wszystkich bloków technologicznych oczyszczalni: mechanicznego, biologicznego i gospodarki osadowej. Do zrealizowania planowane są następujące prace: 1) budowa nowych obiektów: komory rozprężnej, budynku krat, piaskowników wirowych, komory przelewowej, zbiornika retencyjnego ścieków, pompowni retencjonowanych ścieków, osadnika wtórnego radialnego, punktu poboru ścieków, komory pomiarowej ścieków oczyszczonych, stacji dmuchaw, stacji dozowania PIX-u, stacji dozowania źródła węgla, komór osadowych, pompowni osadu i części pływających z komorami osadowymi, stacji odwadniania osadu, silosu na wapno, biofiltra, stanowiska czyszczenia wozów asenizacyjnych, komory spustowej, pompowni wody technologicznej; 2) przebudowa istniejących obiektów: w części mechanicznej oczyszczalni ścieków - komory pomiarowej ścieków, - w części biologicznej oczyszczalni reaktora biologicznego RB i osadnika wtórnego radialnego - w części osadowej oczyszczalni ścieków komór tlenowych stabilizacji osadu, zbiorników zagęszczania grawitacyjnego osadu, pompowni osadów i ścieków oraz pompowni osadów i ścieków (zakładowej). 3) likwidacja obiektów i demontaż urządzeń. (Polish)
    0 references
    The aim of the project is to protect the environment and to organise the waste water management in the Mielno agglomeration as a result of the reconstruction and expansion of the sewage treatment plant in Uni¶cie, the project included in the sewage treatment plant is located in the West Pomeranian Voivodeship, on the measure between Lake Jamno and the Baltic Sea. The sewage treatment plant in Unišciu is a mechanical-biological treatment plant with increased removal of nitrogen and phosphorus compounds. The treatment plant will ultimately treat municipal waste water from the entire agglomeration of Mielno and waste water from the area of AGL. It’s a Sarbino. At AGL. Mielno has an equivalent population of 25.674 RLM. The treatment plant is dimensioned on the basis of forecasts of the quantities of waste water and pollutant loads also from the AGL area. It’s a Sarbino. The project has designed the reconstruction and expansion of all technological units of the treatment plant: mechanical, biological and sedimentary economy. The following work is planned to be carried out: 1) construction of new facilities: expansion chambers, lattice building, centrifugal sandboxes, overflow chambers, sewage retention tanks, pumping rooms for retention sewage, secondary radial settler, sewage extraction point, measuring chambers of purified effluents, blower stations, PIX dispensing stations, carbon source dosing stations, sediment chambers, sediment pumps and floating parts with sediment chambers, station 2) Reconstruction of existing facilities: in the mechanical part of the sewage treatment plant – the effluent measuring chamber, – in the biological part of the biological reactor treatment plant RB and the radial secondary settler – in the sediment waste water treatment plant of sludge stabilisation chambers, sludge gravity compaction tanks, sludge and sewage pumping plant, and a sludge and sewage pumping plant. 3) Dismantling objects and dismantling equipment. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.03.00-00-0070/16
    0 references