“Comprehensive thermomodernisation of a multi-family building located at ul. Markiewicz 2,4,6,8 in Świnoujście which is in SM resources in Świnoujście with the use of RES installations and intelligent Energy Management System” (Q84740)
Jump to navigation
Jump to search
Project Q84740 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | “Comprehensive thermomodernisation of a multi-family building located at ul. Markiewicz 2,4,6,8 in Świnoujście which is in SM resources in Świnoujście with the use of RES installations and intelligent Energy Management System” |
Project Q84740 in Poland |
Statements
1,601,758.85 zloty
0 references
2,135,678.47 zloty
0 references
75.0 percent
0 references
1 January 2018
0 references
31 December 2021
0 references
SPÓŁDZIENIA MIESZKANIOWA LOKATORSKO WŁASNOŚCIOWA SŁOWIANIN
0 references
Budynek planowany do kompleksowej termomodernizacji w ramach Projektu jest zlokalizowany w Świnoujściu woj. zachodniopomorskie pod adresem: Markiewicza 2,4,6,8. Usytuowanie budynku przedstawia załącznik do dokumentacji aplikacyjnej z mapą poglądową. Efektem realizacji Projektu będzie znacząca poprawa efektywności energetycznej. Zgodnie z wykonanym audytem ex ante oszczędność energii wyniesie 44,39% w porównaniu do stanu sprzed realizacją Projektu. Budynek od momentu powstania tj. od roku 1996 nie przeszedł znaczących prac w tym zakresie poza doraźnymi pracami naprawczymi. Budynek nie spełnia wymagań dotyczących maksymalnej wartości wskaźnika E sezonowego zapotrzebowania na ciepło do ogrzewania w standardowym sezonie grzewczym, gdyż przegrody zewnętrzne mają niską izolacyjność termiczną. Zakres przedmiotowy Projektu obejmuje: 1.1. Docieplenie stropodachu wentylowanego włókniną celulozową 1.2. docieplenie ścian zewnętrznych styropianem 1.3. Wymianę okien w częściach wspólnych na nowe 2. Zmodernizowanie systemu grzewczego budynku 3. System monitorowania i zarządzania energią, 4. montaż instalacji fotowoltaicznej (Polish)
0 references
The building planned for comprehensive thermal modernisation within the Project is located in Świnoujście Zachodniopomorskie voivodship at: Markiewicz 2,4,6,8. The location of the building is provided by an annex to the application documentation with an illustrative map. The project will result in a significant improvement in energy efficiency. According to the ex ante audit, energy savings will be 44.39 % compared to the pre-project condition. Since its inception, i.e. since 1996, the building has not undergone significant work in this area except for ad hoc repair work. The building does not meet the requirements of the maximum E-indicator of the seasonal heat demand for heating in the standard heating season, as the external partitions have low thermal insulation. The scope of the Project includes: IT’S 1.1. Warming of ventilated cellulose trophode 1.2. insulation of external walls with styrofoam 1.3. Replacement of windows in common parts for new 2. Modernising the heating system of building 3. Energy monitoring and management system, 4. installation of photovoltaic installation (English)
14 October 2020
0 references
Identifiers
POIS.01.03.02-00-0028/17
0 references