Bridge no. no. 163-024 behind Higher Brod (Q74893)

From EU Knowledge Graph
Revision as of 03:52, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q74893 in Czech Republic
Language Label Description Also known as
English
Bridge no. no. 163-024 behind Higher Brod
Project Q74893 in Czech Republic

    Statements

    0 references
    37,448,775.89 Czech koruna
    0 references
    1,497,951.04 Euro
    10 January 2020
    0 references
    44,057,383.41 Czech koruna
    0 references
    1,762,295.34 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    16 May 2017
    0 references
    20 November 2017
    0 references
    31 December 2017
    0 references
    Správa a údržba silnic Jihočeského kraje
    0 references

    49°0'25.6"N, 14°29'18.2"E
    0 references
    37010
    0 references
    Obsahem projektu je z technického hlediska rekonstrukce mostu, kdy dojde k demolici stávajícího mostu, výstavbě nového ve stávající poloze, úpravě komunikace v předpolích mostu a úpravě koryta a břehů potoka v okolí mostu. Celková úprava komunikace je navržena v délce cca 189 m. (Czech)
    0 references
    The project includes the reconstruction of the bridge from a technical point of view, when the existing bridge will be demolished, the new one in the existing position, the modification of the road in the forefields of the bridge and modification of the trough and the banks of the stream around the bridge. The overall modification of the communication is designed in a length of about 189 m. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.1.42/0.0/0.0/15_002/0001996
    0 references