Revitalisation of interstation sections Petříkov – Borovany (outside) – Č. Budějovice (outside) (Q72147)

From EU Knowledge Graph
Revision as of 02:27, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q72147 in Czech Republic
Language Label Description Also known as
English
Revitalisation of interstation sections Petříkov – Borovany (outside) – Č. Budějovice (outside)
Project Q72147 in Czech Republic

    Statements

    0 references
    0 references
    0 references
    375,680,209.05 Czech koruna
    0 references
    15,027,208.36 Euro
    10 January 2020
    0 references
    470,488,308.0 Czech koruna
    0 references
    18,819,532.32 Euro
    10 January 2020
    0 references
    79.85 percent
    0 references
    30 May 2016
    0 references
    31 May 2017
    0 references
    20 July 2017
    0 references
    Správa železniční dopravní cesty, státní organizace
    0 references
    0 references

    50°5'20.22"N, 14°25'13.04"E
    0 references

    50°5'7.01"N, 14°25'23.81"E
    0 references
    11000
    0 references
    Jedná se o stavbu, která se nachází na celostátní jednokolejné elektrifikované trati zařazené do kategorie TEN-T České Velenice - České Budějovice. Předmětem projektu je rekonstrukce železničního svršku a spodku, nová nástupiště, rekonstrukce žel. přejezdů, umělých staveb - mostů, propustků a zdí a ostatních zařízení ve vybraných traťových úsecích a zastávkách. Dále budou provedeny úpravy zabezpečovacího a sdělovacího zařízení, rozvodů VN a NN včetně osvětlení. (Czech)
    0 references
    It is a construction located on a nationwide single-track electrified line classified as TEN-T České Velenice – České Budějovice. The object of the project is the reconstruction of the railway superstructure and substructure, new platforms, reconstruction of railway crossings, artificial buildings – bridges, culverts and walls and other installations in selected line sections and stops. In addition, modifications of signalling and communication equipment, HV and LN distributions including lighting will be carried out. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.04.1.41/0.0/0.0/15_001/0000073
    0 references