Remediation of rock rolling in the street of the dam in k.u. Presbyteries (Q59354)

From EU Knowledge Graph
Revision as of 00:09, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q59354 in Czech Republic
Language Label Description Also known as
English
Remediation of rock rolling in the street of the dam in k.u. Presbyteries
Project Q59354 in Czech Republic

    Statements

    0 references
    2,190,917.5 Czech koruna
    0 references
    87,636.7 Euro
    10 January 2020
    0 references
    2,577,550.0 Czech koruna
    0 references
    103,102.0 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    11 September 2019
    0 references
    30 September 2020
    0 references
    Statutární město Brno
    0 references
    0 references
    0 references

    49°12'8.64"N, 16°36'28.44"E
    0 references

    49°11'55.68"N, 16°36'7.06"E
    0 references
    60200
    0 references
    Cílem projektu je provedení sanačních opatření v lokalitě s vysokou rizikovostí z hlediska možnosti zranění osob a vzniku škod na majetku spadem zvětralého kamene. Sanačním opatřením dojde k zabránění dalšímu pádu horniny a tím se zajistí ochrana majetku a zdraví osob. Po dokončení budou hlavními viditelnými prvky pouze dřevěné palisády a ocelové sítě v ploše skalního výchozu. Provedená sanace nebude mít zásadní vliv na vnímání skalních svahů a výchozů a ani na dotčenou významnou lokalitu. (Czech)
    0 references
    The aim of the project is to implement remediation measures in the locality with high risk in terms of the possibility of personal injury and damage to property caused by weathered stone. The remediation measure will prevent further fall of the rock and thus ensure the protection of property and health of persons. Upon completion, the main visible elements will be only wooden palisades and steel nets in the rock outpost area. The remediation carried out will not have a major impact on the perception of rock slopes and exits or on the significant site concerned. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/18_101/0009075
    0 references