‘Investigation of the allee a cross, Olešná’ (Q68415)

From EU Knowledge Graph
Revision as of 09:16, 24 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The object of the project is the renewal and regeneration of the two-sided avenue U Křížku v k.ú. Olešná near Havlíček Brod. As part of the implementation of the event, treatment of existing trees and planting of new trees, including subsequent care, will be carried out. Part of the project is the planned removal of 3 trees. A total of 106 trees will be treated and 10 trees are designed for planting. The total length of the regenerated avenue is...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
‘Investigation of the allee a cross, Olešná’
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    293,197.68 Czech koruna
    0 references
    11,727.91 Euro
    10 January 2020
    0 references
    366,497.1 Czech koruna
    0 references
    14,659.88 Euro
    10 January 2020
    0 references
    80 percent
    0 references
    26 September 2016
    0 references
    30 September 2020
    0 references
    Obec Olešná
    0 references
    0 references

    49°36'29.34"N, 15°34'9.91"E
    0 references
    58001
    0 references
    Předmětem projektu je obnovení a regenerace oboustranné aleje U Křížku v k.ú. Olešná u Havlíčkova Brodu. V rámci realizace akce bude provedeno ošetření stávajících dřevin a dosadba nových stromů včetně následné péče. Součástí projektu je i plánované odstranění 3 ks dřevin. Celkem bude ošetřeno 106 ks stromů a k výsadbě je navrženo 10 stromů. Celková délka regenerované aleje je ca 800 m. (Czech)
    0 references
    The object of the project is the renewal and regeneration of the two-sided avenue U Křížku v k.ú. Olešná near Havlíček Brod. As part of the implementation of the event, treatment of existing trees and planting of new trees, including subsequent care, will be carried out. Part of the project is the planned removal of 3 trees. A total of 106 trees will be treated and 10 trees are designed for planting. The total length of the regenerated avenue is about 800 m. (English)
    24 October 2020
    0 references

    Identifiers

    CZ.05.4.27/0.0/0.0/15_012/0000065
    0 references