Energy-saving measures — House House No 661, Uničov (Q75233)

From EU Knowledge Graph
Revision as of 22:02, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project solves construction modifications (reconstruction) of the existing apartment building on Bratří Čapků street No. 661 in Uničov. The building is located on plot no. 964 in the cadastral territory of Uničov.The building will be insulated by the perimeter masonry, insulation of the ceiling from the ground tent, insulation of the floor from the basement side and an exchange of hole fillings. The main objective of the project is to improv...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy-saving measures — House House No 661, Uničov
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,049,251.12 Czech koruna
    0 references
    41,970.04 Euro
    10 January 2020
    0 references
    4,114,710.3 Czech koruna
    0 references
    164,588.41 Euro
    10 January 2020
    0 references
    25.5 percent
    0 references
    10 February 2017
    0 references
    31 July 2017
    0 references
    30 September 2017
    0 references
    Město Uničov
    0 references
    0 references

    49°46'17.8"N, 17°6'36.0"E
    0 references
    78391
    0 references
    Projekt řeší stavební úpravy (rekonstrukci) stávajícího bytového domu na ulici Bratří Čapků č.p. 661 v Uničove. Budova stojí na parcele č. 964 v katastrálním území Uničov.Na stavbě bude provedeno zateplení obvodového zdiva, zateplení stropu ze stany půdy, zateplení podlahy ze strany suterénu a výměna otvorových výplní. Hlavním cílem projektu je zlepšit současný tepelně-technický stav objektu a dosáhnout energetický úspor. (Czech)
    0 references
    The project solves construction modifications (reconstruction) of the existing apartment building on Bratří Čapků street No. 661 in Uničov. The building is located on plot no. 964 in the cadastral territory of Uničov.The building will be insulated by the perimeter masonry, insulation of the ceiling from the ground tent, insulation of the floor from the basement side and an exchange of hole fillings. The main objective of the project is to improve the current thermal-technical state of the building and achieve energy savings. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.2.11/0.0/0.0/15_018/0001276
    0 references