D1 Modernisation — Branch 22, EXIT 162 Great Bíteš — EXIT 168 (Q72400)

From EU Knowledge Graph
Revision as of 21:43, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The object of the project is modernisation of the D1 motorway in the section Velka Bíteš – Nine Crosses (km 162.750-168.170) in the length of 5.420 km. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communica...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
D1 Modernisation — Branch 22, EXIT 162 Great Bíteš — EXIT 168
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    768,495,713.4 Czech koruna
    0 references
    30,739,828.54 Euro
    10 January 2020
    0 references
    911,863,444.0 Czech koruna
    0 references
    36,474,537.76 Euro
    10 January 2020
    0 references
    84.28 percent
    0 references
    8 April 2016
    0 references
    20 November 2017
    0 references
    30 November 2017
    0 references
    Ředitelství silnic a dálnic ČR
    0 references
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je modernizace dálnice D1 v úseku Velká Bíteš - Devět křížů (km 162,750 - 168,170) v délce 5,420 km. Vlastní modernizace spočívá v rozšíření na kategorii D 28, resp. 2 jízdní pásy o šířce zpevnění 11,5 m a zlepšení stavebně technického stavu dálnice. Tyto úpravy přispějí k podstatnému zvýšení bezpečnosti a plynulosti provozu na této značně zatížené komunikaci a rovněž i k oddálení běžných oprav. (Czech)
    0 references
    The object of the project is modernisation of the D1 motorway in the section Velka Bíteš – Nine Crosses (km 162.750-168.170) in the length of 5.420 km. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communication as well as delaying normal repairs. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.04.2.39/0.0/0.0/15_003/0000044
    0 references