D3 motorway, construction 0309/II Ševetín — Borek_1 (Q72376)

From EU Knowledge Graph
Revision as of 21:43, 23 October 2020 by DG Regio (talk | contribs) (‎Removed claim: summary (P836): The purpose of the project is the construction of the D3 motorway in 0309/II Ševetín — Borek. This is the extension of the existing road I/3, which was already constructed as a half of the profile of the motorway, to a 10.680 km motorway profile of category D 27,5/120. The construction of the D3 motorway will improve substantially the flow of traffic and increase operational security. From an environmental point of view, there will be a reduct...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
D3 motorway, construction 0309/II Ševetín — Borek_1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    907,441,408.54 Czech koruna
    0 references
    36,297,656.34 Euro
    10 January 2020
    0 references
    1,525,111,611.0 Czech koruna
    0 references
    61,004,464.44 Euro
    10 January 2020
    0 references
    59.5 percent
    0 references
    13 December 2016
    0 references
    18 August 2021
    0 references
    Ředitelství silnic a dálnic ČR
    0 references
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je výstavba dálnice D3 v úseku 0309/II Ševětín - Borek. Jedná se o rozšíření stávající silnice I/3, která již byla vybudována jako poloviční profil dálnice, na dálniční profil kategorie D 27,5/120 v délce 10,680 km. Realizací výstavby dálnice D3 dojde k podstatnému zlepšení plynulosti dopravy a zvýšení bezpečnosti provozu. Z hlediska životního prostředí, plynulým provozem dojde ke snížení celkových emisí z dopravy v okolí stávající komunikace. (Czech)
    0 references

    Identifiers

    CZ.04.2.39/0.0/0.0/15_002/0000084
    0 references