The improvement of the energy performance of the building 15. Primary schools in ul. J. A. Koumenski No 474, Most — Recovery (Q73856)

From EU Knowledge Graph
Revision as of 21:32, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The aim of the project is to improve the internal working environment in the pavilions of building 15. Elementary school Most, namely by installation of ventilation equipment using waste heat (activity 5.1b).The project is administered simultaneously with a project that deals with insulation of the primary school building called "Reduction of energy performance of building 15. Elementary school in ul. J. A. Comenius No. 474, Most – Insulated" (a...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
The improvement of the energy performance of the building 15. Primary schools in ul. J. A. Koumenski No 474, Most — Recovery
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    5,402,304.6 Czech koruna
    0 references
    216,092.18 Euro
    10 January 2020
    0 references
    7,717,578.0 Czech koruna
    0 references
    308,703.12 Euro
    10 January 2020
    0 references
    70 percent
    0 references
    30 November 2020
    0 references
    Statutární město Most
    0 references
    0 references
    0 references

    50°29'52.15"N, 13°38'50.46"E
    0 references
    43401
    0 references
    Cílem projektu je zlepšení vnitřního pracovního prostředí v pavilonech areálu budovy 15. ZŠ Most, a to instalací vzduchotechniky s využitím odpadního tepla (aktivita 5.1b).Projekt je podáván současně s projektem, který řeší zateplení budovy ZŠ s názvem "Snížení energetické náročnosti budovy 15. Základní školy v ul. J. A. Komenského č.p. 474, Most - zateplení" (aktivita 5.1a), hash Hs3WfP, jiná výše dotace. (Czech)
    0 references
    The aim of the project is to improve the internal working environment in the pavilions of building 15. Elementary school Most, namely by installation of ventilation equipment using waste heat (activity 5.1b).The project is administered simultaneously with a project that deals with insulation of the primary school building called "Reduction of energy performance of building 15. Elementary school in ul. J. A. Comenius No. 474, Most – Insulated" (activity 5.1a), hash Hs3WfP, other amount of subsidy. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/18_100/0009228
    0 references