Upgrading of the line Veselí n.L. — Tábor — Part II, section Veselí n. L. — Doubí u Tábora, Stage 2, Soběslav — Doud_1 (Q72308)

From EU Knowledge Graph
Revision as of 21:24, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The IV Railway Transit Corridor is also modernised on the basis of the adopted concept of the railway network development. The object of the project is its part – the section between the station Soběslav (where the previous phase of the construction, the section Veselí nad Lužnicí (outside) – Soběslav, completed in 2015) and the stop stop Doubí u Tábora (including). Here the line follows the completed section Tábor – Doubí u Tábora in advance, l...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Upgrading of the line Veselí n.L. — Tábor — Part II, section Veselí n. L. — Doubí u Tábora, Stage 2, Soběslav — Doud_1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    1,495,033,037.18 Czech koruna
    0 references
    59,801,321.49 Euro
    10 January 2020
    0 references
    1,804,701,823.0 Czech koruna
    0 references
    72,188,072.92 Euro
    10 January 2020
    0 references
    82.84 percent
    0 references
    10 September 2019
    0 references
    1 July 2023
    0 references
    Správa železniční dopravní cesty, státní organizace
    0 references
    0 references

    50°5'20.22"N, 14°25'13.04"E
    0 references

    50°5'7.01"N, 14°25'23.81"E
    0 references
    11000
    0 references
    Na základě přijaté koncepce rozvoje železniční sítě je modernizován i IV. tranzitní železniční koridor. Předmětem projektu je jeho součást - úsek mezi stanicí Soběslav (kde se navazuje na předchozí etapu stavby, úsek Veselí nad Lužnicí (mimo) - Soběslav, dokončený v roce 2015) a zástavkou Doubí u Tábora (včetně). Zde trať navazuje na v předstihu dokončený úsek Tábor - Doubí u Tábora, zprovozněný v roce 2009. (Czech)
    0 references
    The IV Railway Transit Corridor is also modernised on the basis of the adopted concept of the railway network development. The object of the project is its part – the section between the station Soběslav (where the previous phase of the construction, the section Veselí nad Lužnicí (outside) – Soběslav, completed in 2015) and the stop stop Doubí u Tábora (including). Here the line follows the completed section Tábor – Doubí u Tábora in advance, launched in 2009. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.04.1.41/0.0/0.0/15_001/0000328