Reducing the energy demand of the Březnice cultural house (Q71867)

From EU Knowledge Graph
Revision as of 20:48, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The object of the project is to reduce energy consumption in the building of the cultural house in Březnice, which is located in the monument zone. According to the NPÚ, it is necessary to preserve the existing ceramic facade tiles and the view concrete, which form the perimeter casing of the building. For this reason, only energy measures to insulate the roof structure of the building will be implemented and the existing unchanged windows and...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reducing the energy demand of the Březnice cultural house
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,170,450.05 Czech koruna
    0 references
    46,818.00 Euro
    10 January 2020
    0 references
    2,926,125.13 Czech koruna
    0 references
    117,045.01 Euro
    10 January 2020
    0 references
    40.0 percent
    0 references
    29 September 2016
    0 references
    9 April 2019
    0 references
    30 April 2019
    0 references
    Město Březnice
    0 references
    0 references
    0 references

    49°33'41.65"N, 13°58'25.00"E
    0 references
    26272
    0 references
    Předmětem projektu je snížení spotřeby energie v budově kulturního domu v Březnici, který se nachází v památkové zóně. Dle vyjádření NPÚ je nutné zachovat stávající keramické obklady fasády a pohledový beton, které tvoří obvodový plášť budovy. Z tohoto důvodu budou realizována pouze energetická opatření na zateplení střešní konstrukce objektu a dojde k nahrazení stávajících doposud nevyměněných oken a dveří s výjimkou proskleného vstupního atria, které dle doporučení NPÚ má zůstat bez zásahů. (Czech)
    0 references
    The object of the project is to reduce energy consumption in the building of the cultural house in Březnice, which is located in the monument zone. According to the NPÚ, it is necessary to preserve the existing ceramic facade tiles and the view concrete, which form the perimeter casing of the building. For this reason, only energy measures to insulate the roof structure of the building will be implemented and the existing unchanged windows and doors will be replaced, with the exception of the glass input atrium, which should remain uninterrupted according to the recommendations of the SAO. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/15_019/0001459
    0 references