Construction of works on p. 1356 of the cadastral district. Mirotice (Q71583)

From EU Knowledge Graph
Revision as of 20:31, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project plan deals with the construction of water area in the form of a pool (Land p. no. 1356 in k.ú. Mirotice), which will act as water management, protectionist and landscape forming. The planned construction of the pool meets the intended objectives, namely increasing the retention capacity of the site and the creation of a suitable biotope for rarer species of plants and fauna.The planned action will contribute to improving the water re...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Construction of works on p. 1356 of the cadastral district. Mirotice
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    630,139.61 Czech koruna
    0 references
    25,205.58 Euro
    10 January 2020
    0 references
    630,139.61 Czech koruna
    0 references
    25,205.58 Euro
    10 January 2020
    0 references
    100 percent
    0 references
    31 January 2021
    0 references
    xxx
    0 references
    0 references

    49°26'42.22"N, 14°0'5.04"E
    0 references

    49°28'34.46"N, 14°4'16.00"E
    0 references
    39804
    0 references
    Záměr projektu řeší výstavbu vodní plochy v podobě tůně (pozemková p. č. 1356 v k.ú. Mirotice), která bude zastávat funkci vodohospodářskou, ochranářskou a krajinotvornou. Plánovaná výstavba tůně splňuje zamýšlené cíle, a to zvýšení retenční schopnosti lokality a vznik vhodného biotopu pro vzácnější druhy rostlin a živočichů.Přínosem plánované akce bude zlepšení vodního režimu silně degradovaných ploch v lokalitě Bílé potoky, a to tvorbou středně velké průtočné tůně. (Czech)
    0 references
    The project plan deals with the construction of water area in the form of a pool (Land p. no. 1356 in k.ú. Mirotice), which will act as water management, protectionist and landscape forming. The planned construction of the pool meets the intended objectives, namely increasing the retention capacity of the site and the creation of a suitable biotope for rarer species of plants and fauna.The planned action will contribute to improving the water regime of heavily degraded areas in the location of the White brooks by creating a medium-sized flow basin. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.4.27/0.0/0.0/18_108/0008969
    0 references