The extension of the walking pavement of the Wolker Street, Krusice — Elea II. (Q62071)

From EU Knowledge Graph
Revision as of 13:23, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The aim of the project is to increase transport safety and improve the status of barrier-free roads for pedestrians in Kraslice through the reconstruction of the existing condition and the construction of a new sidewalk along road III/21046., translated_summary)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
The extension of the walking pavement of the Wolker Street, Krusice — Elea II.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    3,950,291.16 Czech koruna
    0 references
    158,011.65 Euro
    1 October 2020
    0 references
    4,158,201.23 Czech koruna
    0 references
    166,328.05 Euro
    1 October 2020
    0 references
    95.0 percent
    0 references
    17 May 2016
    0 references
    14 September 2018
    0 references
    14 September 2018
    0 references
    Město Kraslice
    0 references
    0 references

    50°19'46.9"N, 12°32'8.5"E
    0 references
    35801
    0 references
    Cílem projektu je zvýšení bezpečnosti dopravy a zlepšení stavu bezbariérovosti komunikací pro pěší v Kraslicích prostřednictvím rekonstrukce stávajícího stavu a výstavby nového chodníku podél silnice III/21046. (Czech)
    0 references
    The aim of the project is to increase transport safety and improve the status of barrier-free roads for pedestrians in Kraslice through the reconstruction of the existing condition and the construction of a new sidewalk along road III/21046. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.4.59/0.0/0.0/16_038/0004812
    0 references