Kompost aged — Chotíkov u Cynjewelry nad Ohří nad Ohří (Q63328)

From EU Knowledge Graph
Revision as of 13:19, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project will acquire a technique that will be used for composting for material use of waste – the construction of the Kompostárna – Chotíkov u Kynšperka nad Ohří. The composting plant will be operated according to Act No. 185/2001 Coll., on Wastes. The capacity of the compost plant will be 700 tonnes with the treatment of municipal waste, the share of which will be at least 50 %. Composting will take place in the bags. The place of realisati...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Kompost aged — Chotíkov u Cynjewelry nad Ohří nad Ohří
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    3,302,250.0 Czech koruna
    0 references
    132,090.0 Euro
    10 January 2020
    0 references
    3,885,000.0 Czech koruna
    0 references
    155,400.0 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    9 November 2016
    0 references
    31 March 2019
    0 references
    Miroslav Kazilovský
    0 references
    0 references
    0 references

    50°7'18.62"N, 12°31'52.00"E
    0 references
    35751
    0 references
    Projektem dojde k pořízení techniky, která bude používána ke kompostování pro materiálové využití odpadů - vybudování Kompostárny - Chotíkov u Kynšperka nad Ohří. Kompostárna bude provozována dle zákona č. 185/2001 Sb.,o odpadech. Kapacita kompostárny bude 700 tun se zpracováním komunálního odpadu, jehož podíl bude min. 50 %. Kompostování bude probíhat do vaků. Místo realizace je na parcele 145 v katastrálním území Chotíkov u Kynšperka nad Ohří. (Czech)
    0 references
    The project will acquire a technique that will be used for composting for material use of waste – the construction of the Kompostárna – Chotíkov u Kynšperka nad Ohří. The composting plant will be operated according to Act No. 185/2001 Coll., on Wastes. The capacity of the compost plant will be 700 tonnes with the treatment of municipal waste, the share of which will be at least 50 %. Composting will take place in the bags. The place of realisation is on plot 145 in the cadastral area of Chotíkov u Kynšperka nad Ohří. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.3.29/0.0/0.0/15_005/0000945
    0 references