No label defined (Q61666)

From EU Knowledge Graph
Revision as of 12:49, 23 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,316,593.04 Czech koruna
    0 references
    92,663.72 Euro
    10 January 2020
    0 references
    3,860,988.41 Czech koruna
    0 references
    154,439.54 Euro
    10 January 2020
    0 references
    60.0 percent
    0 references
    28 June 2017
    0 references
    30 June 2019
    0 references
    ASTRO Vlašim spol. s r.o.
    0 references
    0 references
    0 references

    49°42'45.54"N, 14°55'45.88"E
    0 references

    49°42'10.76"N, 14°54'17.17"E
    0 references

    49°43'22.76"N, 14°57'7.34"E
    0 references

    49°44'2.26"N, 14°57'58.03"E
    0 references
    25801
    0 references
    Předmětem projektu je odpojení stávajícího nevyhovujícího zdroje tepla z parní kotelny a jeho náhrada 3 místními plynovými kondenzačními kotly, které se budou nacházet ve výrobní hale (kotel o jmenovitém výkonu 350 kW), kotelně a administrativní budově (2 kotle, každý o jmenovitém výkonu 45 kW). V rámci projektu se počítá s drobnými stavebními úpravami nutnými pro instalaci nových zdrojů tepla. Dále bude provedena nová otopná soustava - dvoutrubková teplovodní s novými deskovými otopnými tělesy. (Czech)
    0 references
    The object of the project is to disconnect the existing non-compliant heat source from the steam boiler room and replace it with 3 local gas condensing boilers, which will be located in the production hall (a boiler with a rated output of 350 kW), a boiler and an administrative building (2 boilers, each with a rated output of 45 kW). The project envisages small building modifications necessary for the installation of new heat sources. In addition, a new heating system – two-tube hot water with new plate heating elements will be implemented. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.2.32/0.0/0.0/15_008/0000982
    0 references