Drainage of municipalities in the water catchment area of the Jizera (Q60935)

From EU Knowledge Graph
Revision as of 11:19, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): This is a group project that mainly addresses:- the construction of a separate sewage sewage in municipalities in the Jizera river basin, in which the drainage and treatment of waste water is not solved – the construction of pressure sewage feeders, which will allow the introduction of waste water from newly drained municipalities to the existing sufficiently capacitive wastewater treatment plant – intensification of the Semčice WWTP in connecti...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Drainage of municipalities in the water catchment area of the Jizera
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    357,489,933.07 Czech koruna
    0 references
    14,299,597.32 Euro
    10 January 2020
    0 references
    560,768,522.46 Czech koruna
    0 references
    22,430,740.90 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    30 September 2022
    0 references
    Vodovody a kanalizace Mladá Boleslav, a.s.
    0 references
    0 references

    50°24'59.15"N, 14°54'36.00"E
    0 references
    29301
    0 references
    Jedná se o skupinový projekt, který zejména řeší:- výstavbu oddílné splaškové kanalizace v obcích v povodí řeky Jizery, ve kterých doposud odvádění a čištění odpadních vod řešeno není- výstavbu tlakových kanalizačních přivaděčů, které umožní přivádět odpadní vody z nově odkanalizovaných obcí na stávající dostatečně kapacitní ČOV - intenzifikaci ČOV Semčice v souvislosti s dobudováním splaškové kanalizace v obci Semčice - skupinový projekt se skládá z 11 částí. (Czech)
    0 references
    This is a group project that mainly addresses:- the construction of a separate sewage sewage in municipalities in the Jizera river basin, in which the drainage and treatment of waste water is not solved – the construction of pressure sewage feeders, which will allow the introduction of waste water from newly drained municipalities to the existing sufficiently capacitive wastewater treatment plant – intensification of the Semčice WWTP in connection with the completion of the sewage sewerage in the municipality of Semčice. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/17_071/0007096
    0 references