I/9 road, I/16 Melnik, bypass, 1nd construction (Q57670)

From EU Knowledge Graph
Revision as of 10:39, 23 October 2020 by DG Regio (talk | contribs) (‎Removed claim: summary (P836): The purpose of the project is the construction of the I/9 road in category MS2 8,5/50 in the total length of the main route of 0.799 km. The construction works first on the route of the existing Prague street and, subsequently, in the original body of the board of the Melník. The connection to the existing communication is addressed by ring tracks in Prague and the Mladá oblesvské Street. The implementation of the project will reduce the burde...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
I/9 road, I/16 Melnik, bypass, 1nd construction
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    137,184,091.65 Czech koruna
    0 references
    5,487,363.67 Euro
    10 January 2020
    0 references
    161,393,049.0 Czech koruna
    0 references
    6,455,721.96 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    18 December 2014
    0 references
    23 September 2016
    0 references
    30 September 2016
    0 references
    Ředitelství silnic a dálnic ČR
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je výstavba přeložky silnice I/9 v kategorii MS2 8,5/50 v celkové délce hlavní trasy 0,799 km. Stavba nejprve vede v trase stávající Pražské ulice a následně v trase původní vlečky cukrovaru Mělník. Napojení na stávající komunikace je řešeno okružními křižovatkami v Pražské a Mladoboleslavské ulici. Realizací projektu dojde ke snížení zátěže obyvatelstva hlukem a exhalacemi, zkrácení jízdní doby a zvýšení plynulosti dopravy a bezpečnosti silničního provozu. (Czech)