Modernisation of Szt Karviná and Havířov – II. part (Q19051)

From EU Knowledge Graph
Revision as of 17:19, 22 October 2020 by DG Regio (talk | contribs) (‎Removed claim: summary (P836): The reconstruction of the pipelines and the modernisation of the electrical and machinery parts of the transmission stations. The aim of the project is to reduce heat loss and self-consumption and to increase the reliability of the operation, by implementing the proposed measures on the SZT networks., remove_old_english_translation)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Modernisation of Szt Karviná and Havířov – II. part
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    22,350,634.4 Czech koruna
    0 references
    894,025.38 Euro
    10 January 2020
    0 references
    55,876,586.0 Czech koruna
    0 references
    2,235,063.44 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    15 February 2018
    0 references
    25 October 2020
    0 references
    Veolia Energie ČR, a.s.
    0 references

    49°50'27.60"N, 18°16'41.70"E
    0 references
    70200
    0 references
    Rekonstrukce potrubního rozvodu a modernizace elektro a strojní části předávacích stanic. Cílem projektu je snížení tepelných ztrát a vlastní spotřeby elektřiny a zvýšení spolehlivosti provozu, prostřednictvím realizace navržených opatření na sítích SZT. a. (Czech)
    0 references

    Identifiers

    CZ.01.3.15/0.0/0.0/16_064/0011868
    0 references