Reconstruction of the Tyršovo embankment in Zlín, 1st stage (Q19039)

From EU Knowledge Graph
Revision as of 17:19, 22 October 2020 by DG Regio (talk | contribs) (‎Removed claim: summary (P836): The project is aimed at the reconstruction of the hot water pipeline system within the district heating supply to Tyrštový náquke in Zlín. The purpose of the project is to optimise pipe diameters, new heat insulation. The aim of the project is to achieve savings from primary energy., remove_old_english_translation)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the Tyršovo embankment in Zlín, 1st stage
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    9,773,152.19 Czech koruna
    0 references
    390,926.09 Euro
    10 January 2020
    0 references
    32,577,173.98 Czech koruna
    0 references
    1,303,086.96 Euro
    10 January 2020
    0 references
    30.0 percent
    0 references
    10 May 2017
    0 references
    26 September 2018
    0 references
    31 December 2018
    0 references
    Teplárna Kladno s.r.o.
    0 references

    50°9'24.62"N, 14°8'25.22"E
    0 references
    27203
    0 references
    Projekt je zaměřen na rekonstrukci horkovodního potrubního systému v rámci centrálního zásobování teplem na Tyršově nábřeží ve Zlíně. Předmětem projektu je provedení optimalizace průměrů potrubí, nových tepelných izolací. Cílem projektu je dosažení úspor primární energie. a. (Czech)
    0 references

    Identifiers

    CZ.01.3.15/0.0/0.0/15_025/0007077
    0 references