Energy savings of Zámečnictví Němec, s.r.o. (Q16800)

From EU Knowledge Graph
Revision as of 16:51, 22 October 2020 by DG Regio (talk | contribs) (‎Removed claim: summary (P836): The project aims at building a photovoltaic power plant with a full power output of 29, 7 kWp and a three-phase converter that ensures the production and supply of electricity to the grid. The FVE will be installed on the roof of the company’s locksmith’s office, German, s.r.o., which partially covers the current electricity consumption, thus reducing the energy intensity of the company. Surplus from EE production will be channelled into a pub...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy savings of Zámečnictví Němec, s.r.o.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    561,214.36 Czech koruna
    0 references
    22,448.57 Euro
    10 January 2020
    0 references
    701,517.96 Czech koruna
    0 references
    28,060.72 Euro
    10 January 2020
    0 references
    80.0 percent
    0 references
    31 December 2019
    0 references
    Zámečnictví Němec, s.r.o.
    0 references
    0 references

    49°17'13.49"N, 16°13'3.14"E
    0 references
    59501
    0 references
    Projekt je zaměřen na vybudování fotovoltaické elektrárny o celkovém výkonu 29, 7 kWp s vyvedeným výkonem do třífázového měniče, který zajišťuje výrobu a dodávku elektrické energie do sítě. FVE bude instalována na střeše provozovny společnosti Zámečnictví Němec, s.r.o., která částečně pokryje současnou spotřebu elektrické energie, čímž se sníží se energetická náročnost společnosti. Přebytky z výroby EE budou směrovány do veřejné distribuční sítě. a. (Czech)
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_178/0013750
    0 references