CONSTRUCTION OF FVE – LACHMAN INTERIER DESIGN (Q16627)

From EU Knowledge Graph
Revision as of 16:41, 22 October 2020 by DG Regio (talk | contribs) (‎Removed claim: summary (P836): The implementation of the present project consists of the installation of the FVE with an installed capacity of 41,18kWp located on the roof of the site., remove_old_english_translation)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
CONSTRUCTION OF FVE – LACHMAN INTERIER DESIGN
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    713,294.82 Czech koruna
    0 references
    28,531.79 Euro
    10 January 2020
    0 references
    1,018,992.6 Czech koruna
    0 references
    40,759.70 Euro
    10 January 2020
    0 references
    70 percent
    0 references
    31 December 2019
    0 references
    LACHMAN INTERIER DESIGN, s.r.o.
    0 references
    0 references

    49°28'13.51"N, 17°6'36.79"E
    0 references
    79601
    0 references
    Realizace předkládaného projektu spočívá v instalaci FVE o instalovaném výkonu 41,18kWp, umístěné na střeše řešeného objektu. a. (Czech)
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_138/0011606
    0 references