Energy savings in the centre Dobršín (Q16215)

From EU Knowledge Graph
Revision as of 16:40, 22 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The object of the project is to realise energy savings during the processing of aggregates in the premises of the production centre Dobršín. Energy savings will be achieved thanks to the replacement of the existing shredder and sorter with new, more energy-efficient variants and at the same time the modification of the processing process by removing the tipper from the handling process. The place of realisation is the premises of the production...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy savings in the centre Dobršín
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    5,610,000.0 Czech koruna
    0 references
    224,400.0 Euro
    10 January 2020
    0 references
    14,025,000.0 Czech koruna
    0 references
    561,000.0 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    10 May 2018
    0 references
    11 September 2018
    0 references
    30 April 2019
    0 references
    Silnice Klatovy a.s.
    0 references
    0 references

    49°23'21.98"N, 13°17'52.30"E
    0 references
    33901
    0 references
    Předmětem projektu je realizace energetických úspor při zpracování kameniva v areálu výrobního střediska Dobršín. Energetických úspor bude dosaženo díky výměně stávajícího drtiče a třídiče za nové, energeticky výhodnější varianty a současně úprava zpracovatelského procesu vyřazením sklápěče z procesu manipulace. Místem realizace je areál výrobního střediska Dobršín na pozemcích s p.č. 57/3, 57/4, 58/4, 58/5, 58/6, 74/6, 74/10, 79, 87, 88, 89, 90, 95, 111 a 120 v k.ú. Dobršín, okres Klatovy. a. (Czech)
    0 references
    The object of the project is to realise energy savings during the processing of aggregates in the premises of the production centre Dobršín. Energy savings will be achieved thanks to the replacement of the existing shredder and sorter with new, more energy-efficient variants and at the same time the modification of the processing process by removing the tipper from the handling process. The place of realisation is the premises of the production centre Dobršín on land with p. no. 57/3, 57/4, 58/4, 58/5, 58/6, 74/6, 74/10, 79, 87, 88, 89, 90, 95, 111 and 120 in k.ú. Dobršín, Klatovy County. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_101/0013163
    0 references