Reduction of energy intensity of selected plants Teplárny Otrokovice a.s. (Q16160)

From EU Knowledge Graph
Revision as of 16:40, 22 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The implementation of the project Reducing energy intensity of selected operations of TOT a.s., which consists of two stages, the first called Reconstruction of the perimeter shell of the administrative building, the second called Reconstruction of outdoor lighting of the TOT a.s. complex will result in a reduction of the energy intensity of selected plants. The project will be realised on land p.č. 334/5, p.č.st. 1473 and p.č.st.1742. a., trans...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reduction of energy intensity of selected plants Teplárny Otrokovice a.s.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    3,153,110.4 Czech koruna
    0 references
    126,124.42 Euro
    10 January 2020
    0 references
    10,510,368.0 Czech koruna
    0 references
    420,414.72 Euro
    10 January 2020
    0 references
    30 percent
    0 references
    1 August 2018
    0 references
    14 June 2019
    0 references
    30 June 2019
    0 references
    Teplárna Otrokovice a.s.
    0 references
    0 references

    49°12'40.36"N, 17°31'37.24"E
    0 references
    76502
    0 references
    Realizací projektu Snížení energetické náročnosti vybraných provozů TOT a.s., který se skládá ze dvou etap, první s názvem Rekonstrukce obvodového pláště správní budovy, druhá s názvem Rekonstrukce venkovního osvětlení areálu TOT a.s. dojde vlivem komplexních řešení ke snížení energetické náročnosti vybraných provozů . Projekt bude realizován na pozemku p.č. 334/5, p.č.st. 1473 a p.č.st.1742. a. (Czech)
    0 references
    The implementation of the project Reducing energy intensity of selected operations of TOT a.s., which consists of two stages, the first called Reconstruction of the perimeter shell of the administrative building, the second called Reconstruction of outdoor lighting of the TOT a.s. complex will result in a reduction of the energy intensity of selected plants. The project will be realised on land p.č. 334/5, p.č.st. 1473 and p.č.st.1742. a. (English)