Implementation of energy saving measures in the production plant of NOVASERVIS spol. s r.o. (Q15414)

From EU Knowledge Graph
Revision as of 16:37, 22 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The aim of the project is to implement saving measures in the form of a change of heat sources (replacement of gas boilers in the boiler room, exchange of gas emitters), insulation of remaining circuit structures, use of secondary thermal energy (waste heat) and exchange of light sources in production areas. The aim of the project is to achieve total savings of 498.9 MWh/r. a., translated_summary)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Implementation of energy saving measures in the production plant of NOVASERVIS spol. s r.o.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    3,057,000.0 Czech koruna
    0 references
    122,280.0 Euro
    10 January 2020
    0 references
    10,190,000.0 Czech koruna
    0 references
    407,600.0 Euro
    10 January 2020
    0 references
    30 percent
    0 references
    23 September 2015
    0 references
    18 December 2017
    0 references
    31 December 2017
    0 references
    NOVASERVIS spol. s r.o.
    0 references
    0 references

    49°12'43.09"N, 16°37'22.30"E
    0 references
    61300
    0 references
    Předmětem projektu je realizace úsporných opatření ve formě změny zdrojů tepla (výměna plynových kotlů v kotelně, výměna plynových zářičů), zateplení zbývajících obvodových konstrukcí, využití sekundární tepelné energie (odpadní teplo) a výměny zdrojů osvětlení ve výrobních prostorech. Cílem projektu je dosáhnout celkové úspory ve výši 498,9 MWh/r. a. (Czech)
    0 references
    The aim of the project is to implement saving measures in the form of a change of heat sources (replacement of gas boilers in the boiler room, exchange of gas emitters), insulation of remaining circuit structures, use of secondary thermal energy (waste heat) and exchange of light sources in production areas. The aim of the project is to achieve total savings of 498.9 MWh/r. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/15_010/0000625
    0 references