Wood – installation of biomass boiler, DPST, heat distribution (Q15349)

From EU Knowledge Graph
Revision as of 16:36, 22 October 2020 by DG Regio (talk | contribs) (‎Removed claim: summary (P836): Installation of a biomass boiler with a capacity of 2,5 MWth. The boiler will burn wood paste. The project includes the removal of the existing obsolete boiler on the burning of biomass, the installation of new transfer stations on strike, the construction of new heat distribution facilities to connect new customers and the installation of the production lines., remove_old_english_translation)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Wood – installation of biomass boiler, DPST, heat distribution
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    20,764,263.37 Czech koruna
    0 references
    830,570.53 Euro
    10 January 2020
    0 references
    34,607,105.63 Czech koruna
    0 references
    1,384,284.23 Euro
    10 January 2020
    0 references
    60.0 percent
    0 references
    21 February 2021
    0 references
    Místní hospodářství Obce Dříteň, spol. s r.o.
    0 references
    0 references

    49°8'31.60"N, 14°20'54.60"E
    0 references
    37351
    0 references
    Instalace kotle na spalování biomasy o výkonu 2,5 MWt. Kotel bude spalovat dřevní hmotu. Součástí projektu je odstranění stávajícího zastaralého kotle na spalování biomasy, instalace nových předávacích stanic u stáv. odběratelů, výstavba nových rozvodů tepla pro napojení nových odběratelů a instalace předávacích stanic. a. (Czech)
    0 references

    Identifiers

    CZ.01.3.09/0.0/0.0/17_158/0012957
    0 references