Energy savings in PILANA Wood, s.r.o. II (Q15655)

From EU Knowledge Graph
Revision as of 16:32, 22 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project solves energy savings in PILANA Wood, s.r.o. at the main building of the company, where the company has administrative facilities and production operations. The aim of the project is to implement measures to reduce energy requirements, especially through building insulation and roof replacement. The activities of the project consist of the processing of the energy audit and subsequently the actual implementation of the measures, i.e....)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy savings in PILANA Wood, s.r.o. II
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    980,164.5 Czech koruna
    0 references
    39,206.58 Euro
    10 January 2020
    0 references
    2,450,411.0 Czech koruna
    0 references
    98,016.44 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    1 September 2015
    0 references
    28 February 2018
    0 references
    27 August 2018
    0 references
    PILANA Wood s.r.o.
    0 references
    0 references

    49°17'26.81"N, 17°29'13.81"E
    0 references

    49°18'52.74"N, 17°28'32.09"E
    0 references
    76824
    0 references
    Projekt řeší úspory energií ve společnosti PILANA Wood, s.r.o. na hlavní budově společnosti, kde má firma administrativní zázemí i výrobní provoz. Cílem projektu je realizovat opatření, které umožní snížit nároky na energie a to především prostřednictvím zateplení budovy a výměny střechy. Aktivity projektu tvoří zpracování energetického auditu a následně samotná realizace opatření, tedy provedení stavebních prací. Příslušná opatření budou navržena po provedení energetického auditu. a. (Czech)
    0 references
    The project solves energy savings in PILANA Wood, s.r.o. at the main building of the company, where the company has administrative facilities and production operations. The aim of the project is to implement measures to reduce energy requirements, especially through building insulation and roof replacement. The activities of the project consist of the processing of the energy audit and subsequently the actual implementation of the measures, i.e. the execution of construction works. Appropriate measures will be proposed after an energy audit has been carried out. and. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/15_010/0002768
    0 references