Reduction of energy performance of buildings of the company Frýdlantské strojírny – Rasl and son a.s. (Q16452)

From EU Knowledge Graph
Revision as of 16:25, 22 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The object of the project is the construction modification of the outer shell and energy-saving measures on the front of the building, the new lighting system in the hall of the former boiler room and the maintenance building, the new hot water heating system and the installation of a photovoltaic power plant on saddle roofs. The investment in reducing the energy performance of the industrial building will result in a reduction in annual energy...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reduction of energy performance of buildings of the company Frýdlantské strojírny – Rasl and son a.s.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    8,016,146.4 Czech koruna
    0 references
    320,645.86 Euro
    10 January 2020
    0 references
    20,040,366.04 Czech koruna
    0 references
    801,614.64 Euro
    10 January 2020
    0 references
    40.0 percent
    0 references
    31 March 2021
    0 references
    Frýdlantské strojírny - Rasl a syn a.s.
    0 references
    0 references

    50°55'29.35"N, 15°5'36.96"E
    0 references
    46401
    0 references
    Předmětem projektu je provedení stavební úpravy obvodového pláště a energeticky úsporných opatření na obálce budovy, novou osvětlovací soustavu v hale bývalé kotelny a budovy údržby, novou teplovodní otopnou soustavu a instalaci fotovoltaické elektrárny na sedlové střechy. Investicí do snížení energetické náročnosti průmyslového objektu dojde ke snížení roční spotřeby energie o 2 871,72 GJ a emisí CO2 o 318,245 t/rok. a. (Czech)
    0 references
    The object of the project is the construction modification of the outer shell and energy-saving measures on the front of the building, the new lighting system in the hall of the former boiler room and the maintenance building, the new hot water heating system and the installation of a photovoltaic power plant on saddle roofs. The investment in reducing the energy performance of the industrial building will result in a reduction in annual energy consumption by 2 871.72 GJ and CO2 emissions by 318.245 t/year. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_101/0013815
    0 references