Reduction of energy intensity in the production area of T Machinery a.s. (Q15737)

From EU Knowledge Graph
Revision as of 16:24, 22 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The object of the project is to reduce the energy intensity of the production administrative building of the weldroom in the company T Machinery a.s. The investment will consist of implementing recommended energy measures based on the energy assessment. The company assumes a savings of consumed energy of 5 938.8 GJ, recovery of waste heat and a real economic return on the project. The exact technical solution of the project defines the energy as...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reduction of energy intensity in the production area of T Machinery a.s.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    5,400,000.0 Czech koruna
    0 references
    216,000.0 Euro
    10 January 2020
    0 references
    18,000,000.0 Czech koruna
    0 references
    720,000.0 Euro
    10 January 2020
    0 references
    30 percent
    0 references
    9 November 2015
    0 references
    10 October 2017
    0 references
    30 June 2018
    0 references
    T Machinery a.s.
    0 references

    48°55'15.10"N, 17°9'56.56"E
    0 references
    69602
    0 references
    Předmětem projektu je snížení energetické náročnosti výrobně administrativního objektu svařovny v areálu společnosti T Machinery a.s. Investice bude spočívat v realizaci doporučených energetických opatření na základě vypracovaného energetického posudku. Společnost předpokládá úsporu spotřebovávané energie ve výši 5 938,8 GJ , využití odpadního tepla a reálnou ekonomickou návratnost projektu. Přesné technické řešení projektu definuje energetický posudek. a. (Czech)
    0 references
    The object of the project is to reduce the energy intensity of the production administrative building of the weldroom in the company T Machinery a.s. The investment will consist of implementing recommended energy measures based on the energy assessment. The company assumes a savings of consumed energy of 5 938.8 GJ, recovery of waste heat and a real economic return on the project. The exact technical solution of the project defines the energy assessment. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/15_010/0003685
    0 references