Increased efficiency of production of metal structures in J.M.KAPA,s.r.o. (Q13076)

From EU Knowledge Graph
Revision as of 16:20, 22 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project is aimed at further increasing the efficiency of production of metal structures in J.M.KAPA,s.r.o. It does not only solve the purchase of technology, but logically follows the third part of the company’s reconstruction, which aims to modernise production and handling spaces in the premises and to streamline production flows by integrating existing and purchased technology together with the warehouse management into the production sys...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Increased efficiency of production of metal structures in J.M.KAPA,s.r.o.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    8,400,000.0 Czech koruna
    0 references
    336,000.0 Euro
    10 January 2020
    0 references
    24,000,000.0 Czech koruna
    0 references
    960,000.0 Euro
    10 January 2020
    0 references
    35 percent
    0 references
    31 December 2017
    0 references
    J.M.KAPA, s.r.o.
    0 references
    0 references

    50°1'58.19"N, 15°11'23.86"E
    0 references
    28002
    0 references
    Projekt je zaměřen na další zvýšení efektivity výroby plechových konstrukcí ve firmě J.M.KAPA,s.r.o. Neřeší pouze nákup technologie, ale logicky navazuje na třetí část rekonstrukce firmy, jejímž cílem je zmodernizovat výrobní a manipulační prostory v areálu a zefektivnit výrobní toky formou integrace stávající i nakupované technologie společně se skladovým hospodářstvím do výrobního systému. Doba realizace projektu bude 23,5 měsíců, zahájení projektu v 01/2016 a ukončení ve 12/2017. a. (Czech)
    0 references
    The project is aimed at further increasing the efficiency of production of metal structures in J.M.KAPA,s.r.o. It does not only solve the purchase of technology, but logically follows the third part of the company’s reconstruction, which aims to modernise production and handling spaces in the premises and to streamline production flows by integrating existing and purchased technology together with the warehouse management into the production system. The project implementation period will be 23.5 months, the start of the project in 01/2016 and the end of the project at 12/2017. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.2.06/0.0/0.0/15_038/0006299
    0 references