Energy Savings March 4809 (Q16007)

From EU Knowledge Graph
Revision as of 16:19, 22 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The aim of the project is the reconstruction of the buildings Březenecká č.p.4809 and the construction of the former sauna on p.no.4865/94, k.ú. Chomutov, and reducing their energy performance. By improving the thermally technical properties of the building envelope and filling of openings, reconstruction of electrical distributions and lighting, the building will be put into operation in the required energy standard, reduced costs, increased co...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy Savings March 4809
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,502,901.0 Czech koruna
    0 references
    100,116.04 Euro
    10 January 2020
    0 references
    5,005,802.0 Czech koruna
    0 references
    200,232.08 Euro
    10 January 2020
    0 references
    50 percent
    0 references
    1 July 2018
    0 references
    31 December 2019
    0 references
    RETION s.r.o.
    0 references
    0 references

    50°28'58.87"N, 13°25'34.97"E
    0 references
    43004
    0 references
    Cílem projektu je rekonstrukce objektů Březenecká č.p.4809 a stavby bývalé sauny na p.č.4865/94, k.ú. Chomutov, a snížení jejich energetické náročnosti. Zlepšením tepelně technických vlastností obálky budovy a výplně otvorů, rekonstrukcí rozvodů elektro a osvětlení dojde ke zprovoznění budovy v požadovaném energetickém standardu, snížení nákladů, zvýšení konkurenceschopnosti a užitné hodnoty. a. (Czech)
    0 references
    The aim of the project is the reconstruction of the buildings Březenecká č.p.4809 and the construction of the former sauna on p.no.4865/94, k.ú. Chomutov, and reducing their energy performance. By improving the thermally technical properties of the building envelope and filling of openings, reconstruction of electrical distributions and lighting, the building will be put into operation in the required energy standard, reduced costs, increased competitiveness and utility value. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/16_061/0011846
    0 references