Energy saving by reconstruction of the Holdys complex (Q15532)

From EU Knowledge Graph
Revision as of 16:14, 22 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project is focused on the revitalisation and reconstruction of the existing production site from 1920 in Děčín with an unemployment rate of 14 %. At present, a small part of the complex is used for rent as warehouses or administrative facilities of various companies. The area becomes two main buildings connected by communication at the level of each floor. Thanks to the reconstruction of objects and installation of heat pumps and renewables...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy saving by reconstruction of the Holdys complex
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    13,544,986.5 Czech koruna
    0 references
    541,799.46 Euro
    10 January 2020
    0 references
    27,089,973.0 Czech koruna
    0 references
    1,083,598.92 Euro
    10 January 2020
    0 references
    50 percent
    0 references
    1 October 2015
    0 references
    30 April 2019
    0 references
    30 April 2019
    0 references
    VITELLO s.r.o.
    0 references
    0 references

    50°48'15.84"N, 14°21'28.04"E
    0 references

    50°46'31.51"N, 14°14'3.52"E
    0 references
    40502
    0 references
    Projekt je zaměřen na revitalizaci a rekonstrukci stávajícího výrobního areálu z roku 1920 v Děčíně s mírou nezaměstnanosti 14 %. V současnosti je využita malá část areálu k pronájmu jako sklady či administrativní zázemí různých firem. Areál se stává ze dvou hlavních budov komunikačně propojených na úrovni jednotlivých podlaží. Díky rekonstrukci objektů a instalaci tepelných čerpacel a OZE pro vlastní spotřebu dojde k předpokládané úspoře energie o více jak 60 % oproti výchozímu stavu. a. (Czech)
    0 references
    The project is focused on the revitalisation and reconstruction of the existing production site from 1920 in Děčín with an unemployment rate of 14 %. At present, a small part of the complex is used for rent as warehouses or administrative facilities of various companies. The area becomes two main buildings connected by communication at the level of each floor. Thanks to the reconstruction of objects and installation of heat pumps and renewables for self-consumption, the expected saving of energy by more than 60 % from the base state. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/15_010/0001714
    0 references