Reduction of energy consumption in Letoplast’s production process (1x 450 t and 1x 220 t) (Q16320)

From EU Knowledge Graph
Revision as of 16:14, 22 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The object of the project is to reduce energy performance in the production process, the implementation of the project will ensure an increase in energy efficiency of the entire production process of thermoplastic injection moulding. As part of the submitted project, this will be mainly energy saving, which is expressed by comparing the currently used technology for more energy-efficient technology with a clamping force of 1x 450 t and 1x 220 t....)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reduction of energy consumption in Letoplast’s production process (1x 450 t and 1x 220 t)
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    4,681,191.9 Czech koruna
    0 references
    187,247.68 Euro
    10 January 2020
    0 references
    15,603,973.0 Czech koruna
    0 references
    624,158.92 Euro
    10 January 2020
    0 references
    30 percent
    0 references
    26 April 2018
    0 references
    1 May 2020
    0 references
    Letoplast s.r.o.
    0 references
    0 references

    49°33'28.30"N, 16°34'48.76"E
    0 references
    67961
    0 references
    Předmětem projektu je snižování energetické náročnosti ve výrobním procesu, realizací projektu bude zajištěno zvýšení energetické účinnosti celého výrobního procesu vstřikování termoplastů. V rámci předkládaného projektu se bude jednat především o energetickou úsporu, která je vyjádřena porovnáním současně používané technologie za technologii energeticky úspornější s uzavírací silou 1x 450t a 1x 220t. Místo realizace projektu je výrobní hala na pozemku č. 2389/2 v katastrálním území Letovice. a. (Czech)
    0 references
    The object of the project is to reduce energy performance in the production process, the implementation of the project will ensure an increase in energy efficiency of the entire production process of thermoplastic injection moulding. As part of the submitted project, this will be mainly energy saving, which is expressed by comparing the currently used technology for more energy-efficient technology with a clamping force of 1x 450 t and 1x 220 t. The place of realisation of the project is a production hall on plot No. 2389/2 in the cadastral territory of Letovice. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_101/0013450
    0 references