Reconstruction of the streets of the Polish and Polish streets and their intersections in m. Swidwin (Q138058)

From EU Knowledge Graph
Revision as of 19:49, 21 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project is located in Zachodniopomorskie Voivodeship, Świdwin County. Part of the task is located in the Municipality of Świdwin (Mondays: 455, 824/9, 454, 480/11, 433/6 and 205. The remainder of the task is located in the village of Świdwin (Mondays 315 and 370). The project covers all the investment tasks necessary to ensure the functionality and operationality of the infrastructure as soon as the material scope is completed. The material...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the streets of the Polish and Polish streets and their intersections in m. Swidwin
Project in Poland financed by DG Regio

    Statements

    0 references
    2,999,892.0 zloty
    0 references
    719,974.08 Euro
    13 January 2020
    0 references
    5,284,654.34 zloty
    0 references
    1,268,317.04 Euro
    13 January 2020
    0 references
    56.77 percent
    0 references
    6 March 2018
    0 references
    4 December 2018
    0 references
    POWIAT ŚWIDWIŃSKI
    0 references
    Projekt jest zlokalizowany w województwie zachodniopomorskim, powiecie świdwińskim. Część zadania jest położona na terenie gminy Miasto Świdwin (działki: 455, 824/9, 454, 480/11, 433/6 i 205. Pozostała część zadania położona jest na terenie gminy wiejskiej Świdwin (działki 315 i 370). Projekt obejmuje wszystkie zadania inwestycyjne niezbędne do zapewnienia funkcjonalności i operacyjności infrastruktury zaraz po zakończeniu realizacji zakresu rzeczowego. Zakres rzeczowy obejmuje: Zadanie nr 1 Opracowanie dokumentacji projektowej, Zadanie nr 2 Świadczenie usług doradczych oraz opracowanie dokumentacji aplikacyjnej w celu uzyskania dofinansowania w ramach RPO WZP 2014-2020 Oś Priorytetowa 5 Zrównoważony transport, Działanie 5.4 Budowa i przebudowa dróg powiatowych Usługa zlecana na zewnątrz. Zadanie nr 3 Roboty budowlane (Zakresu robót m.in.: budowa kanalizacji deszczowej z rur PVC wraz z wykonaniem wpustów ulicznych w ciągu ulicy Kombatantów Polskich i ul. Wojska Polskiego, wykonanie nowej nawierzchni na ul. Kombatantów Polskich i ul. Wojska Polskiego z przebudową istniejących chodników i pasów zieleni, wykonanie małego ronda o średnicy 12 - 14 m o trzech wlotach z azylami dla pieszych, budowa zatoki autobusowej wraz z peronem, budowa miejsc postojowych); Zadanie nr 4 Inspektor nadzoru inwestorskiego i Zadanie nr 5 Promocja projektu. Wnioskodawcą, Inwestorem, Beneficjentem przedmiotowej inwestycji będzie Powiat Świdwiński. Wnioskodawca planuje powierzenie realizacji projektu Powiatowemu Zarządowi Dróg w Świdwinie (PZD). Zarówno Wnioskodawca, jak i PZD posiadają doświadczenie w zakresie pozyskiwania, realizacji, rozliczania i zachowania trwałości projektu. Realizacja projektu będzie prowadzona przez pracowników Starostwa Powiatowego w Świdwinie i PZD metodą PCM. Projekt nie jest zaliczany do projektów dużych, nie generuje dochodu i nie jest objęty pomocą publiczną. (Polish)
    0 references
    The project is located in Zachodniopomorskie Voivodeship, Świdwin County. Part of the task is located in the Municipality of Świdwin (Mondays: 455, 824/9, 454, 480/11, 433/6 and 205. The remainder of the task is located in the village of Świdwin (Mondays 315 and 370). The project covers all the investment tasks necessary to ensure the functionality and operationality of the infrastructure as soon as the material scope is completed. The material scope shall include: Task no. 1 Development of project documentation, Task No 2 Provision of advisory services and preparation of application documentation in order to obtain funding under RPO WZP 2014-2020 Priority Axis 5 Sustainable transport, Measure 5.4 Construction and reconstruction of district roads The service outsourced. Task No. 3 Construction works (Scope of works, among others: construction of rainwater drainage made of PVC pipes with construction of street drains within Kombatantów Polskie Street and ul. Polish Army, construction of a new pavement on ul. Polish veterans and ul. Polish Army with reconstruction of existing pavements and strips of greenery, making a small roundabout with a diameter of 12-14 m with three entrances with asylums for pedestrians, construction of a bus bay with platform, construction of parking spaces); Task No. 4 Investor supervision inspector and Task No. 5 Promotion of the project. The applicant, the Investor, the beneficiary of the investment will be the District of Świdwiński. The applicant plans to entrust the project to the District Road Administration in Świdwin (PZD). Both the Applicant and the PZD have experience in obtaining, implementing, accounting and maintaining the sustainability of the project. The project will be carried out by employees of the District Starostwo in Świdwin and PZD using PCM. The project is not included in large projects, does not generate income and is not covered by public aid. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.05.04.00-32-0003/17
    0 references