“Construction of a photovoltaic installation in a lifting capacity in a marina 15 street” (Q137809)

From EU Knowledge Graph
Revision as of 19:29, 21 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The subject of the project is the construction of two photovoltaic installations, which will be generating sets using renewable energy. The installations concerned will have the power to: Installation PV 1: 49,91 kWp Installation PV 2: 49.91 kWp Installations will generate electricity entirely for own purposes by establishing a blockade of electricity outflow to the public electricity grid with the possibility of releasing surplus electricity in...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Construction of a photovoltaic installation in a lifting capacity in a marina 15 street”
Project in Poland financed by DG Regio

    Statements

    0 references
    426,966.11 zloty
    0 references
    102,471.87 Euro
    13 January 2020
    0 references
    514,417.0 zloty
    0 references
    123,460.08 Euro
    13 January 2020
    0 references
    83.0 percent
    0 references
    21 April 2016
    0 references
    30 June 2019
    0 references
    WOSIK KRZYSZTOF WEKAA-1
    0 references
    0 references
    Przedmiotem projektu jest budowa dwóch instalacji fotowoltaicznych, które będą stanowiły zespoły prądotwórcze wykorzystujące energię odnawialną. Przedmiotowe instalacje będą miały moc: Instalacja PV 1: 49,91 kWp Instalacja PV 2: 49,91 kWp Instalacje wytwarzać będą energię elektryczną w całości na potrzeby własne poprzez założenie blokady wypływu energii elektrycznej do publicznej sieci elektrycznej z możliwością oddawania nadwyżek energii elektrycznej do publicznej sieci elektro-energetycznej w przyszłości tj. po zakończeniu sezonu tj. po 30 września 2019 roku. W ramach projektu Wnioskodawca wykona roboty budowlane dotyczące dachu budynku socjalnego na którym zostanie zamontowana jedna z instalacji PV. Zakres rzeczowy projektu: - Sporządzenie studium wykonalności - Sporządzenie projektów 2 instalacji fotowoltaicznych - Montaż 2 instalacji fotowoltaicznych - Roboty budowlano montażowe i instalacyjne Sposób wdrażania Projekt będzie realizowany w formule „zaprojektuj i wybuduj”, która będzie obejmowała sporządzenie projektów 2 instalacji PV, wykonanie robót dotyczących dachu budynku socjalnego oraz montaż 2 instalacji PV. Projekt realizowany będzie w III etapach: I etap obejmujący przygotowanie dokumentacji projektu: studium wykonalności, projektów 2 instalacji PV II etap obejmujący wymianę/wzmocnienie konstrukcji dachowej wraz z pokryciem na budynku socjalnym oraz montaż instalacji fotowoltaicznej o mocy 43,4 kWp na dachu tego budynku oraz 6,51 kWp na dachu budynku usług turystycznych (całość utworzy 1 instalację PV o sumaryczne mocy 49,91 kWp). III etap obejmujący montaż instalacji fotowoltaicznej o mocy 45,26 kWp na dachu budynku usług turystycznych z częścią gastronomiczną oraz 4,65 kWp na dachu budynku usług turystycznych (całość utworzy 1 instalację PV o mocy 49,91 kWp). Projekt ma charakter stacjonarny i będzie realizowany na nieruchomości stanowiących współwłasność Wnioskodawcy. (Polish)
    0 references
    The subject of the project is the construction of two photovoltaic installations, which will be generating sets using renewable energy. The installations concerned will have the power to: Installation PV 1: 49,91 kWp Installation PV 2: 49.91 kWp Installations will generate electricity entirely for own purposes by establishing a blockade of electricity outflow to the public electricity grid with the possibility of releasing surplus electricity into the public electricity grid in the future, i.e. after the end of the season, i.e. after 30 September 2019. As part of the project, the applicant will perform construction works concerning the roof of a social building on which one of the PV installations will be installed. In-kind scope of the project: — Making a feasibility study – Design of 2 photovoltaic installations – Installation of 2 photovoltaic installations – Construction and installation works The way of implementation The project will be implemented in the “design and build” formula, which will include the preparation of projects of 2 PV installations, the execution of works related to the roof of the social building and the installation of 2 PV installations. The project will be implemented in the third stages: I stage involving the preparation of project documentation: feasibility study, projects of 2 PV II installations, including replacement/reinforcement of roof structure with coverage on the social building and installation of a 43.4 kWp photovoltaic installation on the roof of this building and 6.51 kWp on the roof of the tourist service building (the whole will create 1 PV installation with total power of 49.91 kWp). The third stage includes the installation of a photovoltaic installation of 45,26 kWp on the roof of a tourist service building with a catering part and 4.65 kWp on the roof of the tourist service building (the whole will be created by 1 PV installation with a capacity of 49,91 kWp). The project is of a fixed nature and will be implemented on properties which are joint-owners of the Applicant. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.10.00-32-B200/17
    0 references