Forest Spa Park in Miłomłyno (Q132613)

From EU Knowledge Graph
Revision as of 18:09, 21 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Forest Spa Park in Miłomłyno
Project in Poland financed by DG Regio

    Statements

    0 references
    468,659.94 zloty
    0 references
    112,478.39 Euro
    13 January 2020
    0 references
    557,928.5 zloty
    0 references
    133,902.84 Euro
    13 January 2020
    0 references
    84.0 percent
    0 references
    29 July 2016
    0 references
    31 December 2019
    0 references
    GMINA MIŁOMŁYN
    0 references

    53°45'48.2"N, 19°50'29.0"E
    0 references
    Projekt zlokalizowany jest w mieście Miłomłyn i w sołectwie Tarda (gmina Miłomłyn), które posiadają status obszaru ochrony uzdrowiskowej, zgodnie z rozporządzeniem Rady Ministrów z dnia 17 maja 2016 r. (Dz. U. 2016, poz. 756). Zakres projektu wpisuje się w założenia określone w SzOOP i regulaminie i dotyczy: budowy i wyposażenia publicznie dostępnej infrastruktury uzdrowiskowej obejmującej urządzanie terenów zielonych i wyposażenie ich w urządzenia umożliwiające pełnienie funkcji rekreacyjnych/leczniczych. Dotyczy budowy infrastruktury uzdrowiskowej, która nie istniała na terenie gminy Miłomłyn. Na etapie prac przygotowawczych opracowano projekt budowlany oraz studium wykonalności projektu. W ramach planowanych robót budowlanych zakłada się budowę zespołu urządzeń lecznictwa uzdrowiskowego i małej architektury w ramach dostosowania kompleksu leśnego do funkcji leśnego parku uzdrowiskowego – LPU (lasu ochronnego uzdrowiskowego) poprzez budowę urządzeń lecznictwa uzdrowiskowego i małej architektury w Obszarze Ochrony Uzdrowiskowej Miłomłyn - strefa „A”. Projektowane obiekty będą służyć celom publicznym (obiekty związane z funkcją zdrowotną) i edukacyjnym na terenie projektowanego Leśnego Parku Uzdrowiskowego, w skład którego to wchodzą ciągi piesze, pieszo-rowerowe oraz zespoły terapeutyczne. Planuje się wyposażenie parku w następujące urządzenia małej architektury: ogrodzenie, drogowskaz „turystyczny”, mapa informacyjna sytuowana w miejscach krzyżowania się szlaków turystycznych, „marker miejsca” - witacz”, ławka, kosz na śmieci (z uwzględnieniem zamknięcia), stojak na rowery, tablica informacyjna, zadaszenie od deszczu, zadaszenie stół z ławkami, miejsce grillowania (miejsce organizacji ogniska bez zadaszenia), szalet (suchy), obudowa szaletu typu „toi-toi”, kładka do ruchu pieszego, brama wjazdowa do zespołu parkowego, parking samochodowy (do 10 pojazdów), wiata inhalacyjna, siłownia – stacja terapeutyczna. Planuje się również promocję projektu. (Polish)
    0 references
    The project is located in the town of Miłomłyn and in the village of Tarda (Miłomłyn commune), which have the status of spa protection area, in accordance with the Regulation of the Council of Ministers of 17 May 2016 (Dz. U. 2016, item. 756. The scope of the project shall be in line with the assumptions set out in the Shoop and the Rules of Procedure and shall concern: the construction and equipment of publicly available spa facilities, including the arrangement of green areas and facilities for recreational/healing. It concerns the construction of a spa infrastructure that did not exist in the municipality of Miłomłyn. During the preparatory work, a construction project and a feasibility study of the project were developed. The planned construction works include the construction of a complex of spa treatment facilities and small architecture as part of the adaptation of the forest complex to the function of a forest spa park – LPU (protective forest spa) through the construction of spa treatment facilities and small architecture in the area of health care Miłomłyn – zone “A”. The designed facilities will serve public purposes (objects related to the health function) and education in the area of the designed Forest Spa Park, which consists of walking, foot-bike and therapeutic teams. It is planned to equip the park with the following small architecture facilities: a fence, a "tourist" signpost, an information map located in the places of interbreeding of hiking trails, "place marker" – greeter", bench, garbage basket (including closure), bicycle stand, information board, roofing from rain, roofing table with benches, barbecue area (place of the fireplace without roofing), a scarlet (dry), housing of a "toi-toi-toi" type, parking lot, footbridge, walkway. It is also planned to promote the project. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.06.02.01-28-0003/16
    0 references