Thermal modernisation of Gimpozum 1 in Wągocu (Q134814)

From EU Knowledge Graph
Revision as of 18:07, 21 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Project BC: Thermal modernisation of the gymnasium No. 1 in Wągrowiec" includes four tasks: Tasks No. 1,Termomodernisation of the school building ul. Railway 14": Warming of the outer walls from the inside of light cellular concrete gr. 18-20 cm-757.31 m²; Replacement of windows for wooden windows-188.75 m²; Replacement of external doors to Al-3pieces – 12,58 m²; Warming of the roof with mineral wool gr 20 cm-473.98 m²; Modernisation of central...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of Gimpozum 1 in Wągocu
Project in Poland financed by DG Regio

    Statements

    0 references
    990,063.76 zloty
    0 references
    237,615.30 Euro
    13 January 2020
    0 references
    1,164,780.9 zloty
    0 references
    279,547.42 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    11 April 2017
    0 references
    31 October 2017
    0 references
    GMINA WĄGROWIEC
    0 references
    Projekt pn.: ,,Termomodernizacja obiektów Gimnazjum nr 1 w Wągrowcu" obejmuje realizację czterech zadań: Zadań nr 1 ,,Termomodernizacja budynku szkoły ul. Kolejowa 14":Ocieplenie ścian zewnętrznych od wewnątrz z lekkiego betonu komórkowego gr. 18-20 cm–757,31m2; Wymiana okien na okna drewniane–188,75m2;Wymiana drzwi zewnętrznych na Al–3szt.–12,58 m2; Docieplenie dachu wełną mineralną gr 20cm–473,98m2; Modernizacja instalacji centralnego ogrzewania–1 kpl.; Wymiana oświetlenia na energooszczędne–1kpl.; Wykonanie instalacji fotowoltaicznej (114 paneli) o mocy 29,5kW(AC)/31,92kWp(DC), na dachu skośnym krytym dachówką. Zadanie nr 2 ,,Termomodernizacja budynku szkoły ul. Kolejowa 16": Ocieplenie ścian zewnętrznych od wewnątrz z lekkiego betonu komórkowego–grubość płyt 18–20 cm-202,42m2; Wymiana drzwi zewnętrznych na Al–1 szt. 2,90 m2;Docieplenie dachu wełną mineralną gr. 20cm–375,80m2; Modernizacja instalacji centralnego ogrzewania–1kpl; Wymiana oświetlenia na energooszczędne–1 kpl. Zadanie nr 3 ,,Termomodernizacja budynku sali gimnastycznej": Ocieplenie ścian przy gruncie polistyrenem ekstrudowanym odm. 300 gr. 10cm–23,33m2; Ocieplenie ścian zewnętrznych styropianem EPS 70-40 gr. 15cm – 76,77m2; Ocieplenie ścian (niszy i gzymsów) z pianki fenolowej gr. 8 i 4cm–199,94m2. Zadanie nr 4 ,,Termomodernizacja budynku sanitariatów": Ocieplenie ścian zewnętrznych styropianem EPS 70-40 gr.16 – 132,63m2; Ocieplenie ścian przy gruncie - polistyrenem ekstrudowanym odm. 300 gr.10cm - 33,5 m2; Wymiana drzwi zewnętrznych Al. - 3szt. U=1,3 W/(m2K) – 7,05m2; Wymiana okien PCV U=1,1 W/(m2K); 8szt. – 12,33m2; Docieplenie dachu styropianem EPS 100-38, gr. 22cm laminowanym papą – 115,81 m2; Modernizacja instalacji centralnego ogrzewania–1kpl (w tym m.in wymiana 3 szt. grzejników). Wymiana oświetlenia na energooszczędne-18 opraw typu LED –1kpl. (Polish)
    0 references
    Project BC: Thermal modernisation of the gymnasium No. 1 in Wągrowiec" includes four tasks: Tasks No. 1,Termomodernisation of the school building ul. Railway 14": Warming of the outer walls from the inside of light cellular concrete gr. 18-20 cm-757.31 m²; Replacement of windows for wooden windows-188.75 m²; Replacement of external doors to Al-3pieces – 12,58 m²; Warming of the roof with mineral wool gr 20 cm-473.98 m²; Modernisation of central heating system-1 kpl.; Replacement of lighting with energy-saving-1kpl.; Production of a photovoltaic installation (114 panels) with a power of 29,5 kW(AC)/31,92kWp(DC), on the roof with an inclined roof tiles. Task No. 2,Termomodernisation of the school building ul. Railway 16': Warming of the outer walls from the inside of light cell concrete-thickness of 18-20 cm-202.42 m²; Replacement of external doors for Al-1 pcs. 2,90 m²;Roof warming with mineral wool gr. 20 cm-375.80 m²; Modernisation of central heating system-1 kpl; Replacement of lighting for energy-saving-1 kpl. Task 3,The modernisation of the gym building": Wall warming on the ground with extruded polystyrene pneumothorax. 300 gr. 10 cm-23,33 m²; Insulation of external walls with EPS 70-40 gr. 15 cm – 76,77 m²; Warming of walls (nears and cornices) of phenolic foam gr. 8 and 4 cm-199.94 m². Task 4,The modernisation of the sanitary building": Insulation of external walls with EPS 70-40 gr.16-132.63 m²; Wall warming on the ground – polystyrene extruded ode. 300 gr.10 cm – 33,5 m²; Replacement of external doors Al. — 3 pieces. U=1.3 W/(m2K) – 7,05 m²; Replacement of PVC U=1,1 W/(m2K) windows; It’s 8 pieces. — 12,33 m²; Insulation of the roof with polystyrene EPS 100-38, gr. 22 cm with laminated pap – 115,81 m²; Modernisation of central heating system-1 kpl (including the replacement of 3 units of radiators). Replacement of lighting with energy-saving-18 LED-type fixtures – 1kpl. (English)
    21 October 2020
    0 references

    Identifiers

    RPWP.03.02.01-30-0087/15
    0 references