Replacement and reconstruction of the water treatment system with the expansion of the technological system with retency and levelling tanks with a second degree pumping system in the existing SUW in Rybno (Q132488)

From EU Knowledge Graph
Revision as of 17:41, 21 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Replacement and reconstruction of the water treatment system with the expansion of the technological system with retency and levelling tanks with a second degree pumping system in the existing SUW in Rybno
Project in Poland financed by DG Regio

    Statements

    0 references
    988,003.9 zloty
    0 references
    237,120.94 Euro
    13 January 2020
    0 references
    1,162,357.53 zloty
    0 references
    278,965.81 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 February 2018
    0 references
    30 June 2020
    0 references
    GMINA RYBNO
    0 references
    0 references

    53°23'0.6"N, 19°55'45.1"E
    0 references
    Zostaną podjęte działania: wymiana urządzeń SUW w Rybnie na zapewniające właściwą jakość wody pitnej, usprawnienie systemu tłoczenia wody do sieci tak, aby zapewniał utrzymanie właściwego ciśn. przy jednoczesnej oszczędności energii. Zaplanowano wykonanie nast. prac: wymianę i przebud. inst. technolog. uzdatn. wody w oparciu o filtrację dwustopniową-odżelazianie i odmanganianie w filtrach ciśnieniowych oraz rozbudowę układu technologicznego o zbiorniki retencyjno-wyrówn. z układem pompowym II st. Zakres prac obejmuje: -Ujęcia wody:wymiana: pomp głębinowych wraz z głowicą i armaturą, w studniach 1,2,3; płyt nastudziennych na obudowach studni z włazami, kominkami wentyl. i drabinkami złazowymi;ukształtowanie terenu wokół obudów studni wraz z umocnieniem kostką betonową i obrzeżami. -Technologia SUW: wymiana: inst. technolog., zbiorników i orurowania wraz z osprzętem odżelaziaczy; złóż filtr. z rozbudową o II stopień uzdatniania wody; instalacji napowietrz., płukania, filtrów i chlorowania;demontaż zbiorników hydroforowych z armaturą;montaż: zestawu pomp II-go st.; zbiorników retencyjno-wyrówn.; jednostki osuszania powietrza w hali filtrów;naprawa daszków z mocowaniem oraz uzbrojenie istn. wywietrzaków w przepustnice. -Zasilanie energet. i sterowanie: wymiana inst. oświetlenia oraz gniazd;montaż zasilania urządzeń oraz ogrzewania elektr.;sterowanie automatyczne procesem technologii uzdatn. wody (pełne). -Roboty ogólnobudowlane. Produkt: przebudowana i rozbudowana SUW o Q śr. dob=287 m3/d. Interesariusze: 2 619 mieszkańców Rybna oraz podmioty gospodarcze (Zakład Przetwórstwa Mięsnego) będą korzystać z wody pitnej o wysokich parametrach jakośc., produkowanej w sposób energooszczędny. Projekt kwalifikuje się do dofinansow. zgodnie z założ. z SZOOP dla osi 5 jako typ projektu: budowa i modernizacja systemów zaopatrzenia w wodę (sieci wodociągowe, ujęcia i stacje uzdatniania wody), zamyka się w granicach aglomeracji Rybno(Uchw. Nr XX/475/16 Sejmiku Woj. Warm-Maz). (Polish)
    0 references
    Action will be taken: replacement of SUW equipment in Rybno for good quality drinking water, streamlining the water flow system so as to ensure that proper pressure is maintained while at the same time saving energy. The following works are planned: replacement and refurbishment of inst. technologist water treatment based on two-stage filtration-defertilisation and demanganisation in pressure filters and expansion of the technological system with retency tanks with pump system II st. The scope of work includes: —Water discharges: exchange: deep-sea pumps with head and fittings, in wells 1,2,3; well slabs on well housings with manholes, ventilation fireplaces and escape ladders; elevation around well enclosures with concrete cube and edge reinforcement. —SUW technology: exchange: inst. technologist, tanks and piping including equipment for deferailisers; fold the filter. with extension by II degree of water treatment; overhead installations, rinsing, filters and chlorine;disassembly of hydrophoric tanks with fittings;assembly: a set of pumps II-go st.; retency tanks.; air dehumidification units in the filter hall; repair of mounting roofs and armament of air throttles. —Energet power supply and control: replacement of lighting and sockets;assembly of electrical appliances and heating;control process of water treatment technology (full). —Construction works. Product: reconstructed and extended SUW by Q midd = 287 m³/d. Stakeholders: 2 619 inhabitants of Rybna and economic operators (Meat Processing Plant) will use drinking water with high quality quality, produced in an energy-efficient way. The project is eligible for funding according to the SZOOP assumption for axis 5 as the type of project: the construction and modernisation of water supply systems (water supply networks, intakes and water treatment stations) is closed within the Rybno agglomeration. No XX/475/16 Sejmiku Wojiku. “Warm-Maz”. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.05.02.00-28-0010/18
    0 references