Comprehensive thermal modernisation of the production building complex in the company “REMA” S.A. in Reszl
Project in Poland financed by DG Regio

    Statements

    0 references
    685,890.4 zloty
    0 references
    164,613.70 Euro
    13 January 2020
    0 references
    857,363.0 zloty
    0 references
    205,767.12 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    13 April 2018
    0 references
    31 August 2021
    0 references
    "REMA" SPÓŁKA AKCYJNA
    0 references
    0 references

    54°2'53.9"N, 21°8'31.9"E
    0 references
    Przedmiotem projektu REMA S.A. jest wzrost efektywności energetycznej poprzez głęboką, kompleksową termomodernizację energetyczną zespołu połączonych budynków produkcyjnych wraz z wymianą źródła ciepła z węglowego na gazowe. Zakres rzeczowy projektu obejmuje kwalifikowane do dofinansowania roboty budowlane związane z wymianą stolarki okiennej, ociepleniem ścian zewnętrznych, ociepleniem stropu żelbetowego i poprawą sprawności systemu grzewczego poprzez montaż nagrzewnic gazowych wraz automatyką oraz montaż instalacji gazowej. Zakres prac budowlanych wynika z przeprowadzonego w przedsiębiorstwie audytu energetycznego budynków planowanych do termomodernizacji. Celem działań w projekcie jest zmniejszenie zapotrzebowania obiektu na energię końcową, a tym samym poprawa efektywności energetycznej obiektu. Zakres rzeczowy przedsięwzięcia obejmuje również wydatki na Audyt energetyczny ex ante, ekspertyzę ornitologiczną i chiropterologiczną, Studium wykonalności oraz Audyt energetyczny ex post, lecz nie są one wskazane do dofinansowania. Inwestycja będzie realizowana od 13.04.2018 do 31.08.2021. Najważniejsze etapy realizacji to: Prace przygotowawcze: 04-07.2018 ETAP 1: konkurencyjny wybór wykonawców: 03-06.2019 ETAP 2: roboty budowlane związane z termomodernizacją zespołu budynków produkcyjnych: 07-11.2019 ETAP 3: roboty budowlane związane z wymianą źródła ciepła: 07-08.2021 ETAP 4: audyt energetyczny ex post: 08.2021 Projekt spełnia założenia określone w SZOOP RPO WIM. W rezultacie wykonania zaplanowanych prac o charakterze stricte przedsięwzięć termomodernizacyjnych nastąpi zmniejszenie zużycia energii końcowej obiektu o 54,29% rocznie, zmniejszenie zużycia energii cieplnej o 58,09 % rocznie oraz zmniejszenie zużycia energii elektrycznej o 5,58% rocznie. W konsekwencji znaczącemu ograniczeniu ulegnie również emisja gazów cieplarnianych CO2 do atmosfery(o ponad 60% w skali roku). Adres projektu: ul. Bolesława Chrobrego 5, Reszel; Nr działki 35/15, obręb 1 (Polish)
    0 references
    The subject of the REMA S.A. project is to increase energy efficiency through a deep, comprehensive thermal modernisation of the combined production buildings together with the exchange of heat source from coal to gas. The project’s material scope includes eligible construction works related to the replacement of window joinery, insulation of external walls, insulation of the reinforced concrete ceiling and improvement of the efficiency of the heating system through installation of gas heaters together with automation and installation of gas installation. The scope of construction work results from the company’s energy audit of buildings planned for thermal modernisation. The aim of the project is to reduce the final energy demand of the facility and thus improve the energy efficiency of the facility. The scope of the project also covers expenditure on Ex ante Energy Audit, Ornithological and Chiropterological Expertise, Feasibility Study and Ex-post Energy Audit, but are not eligible for co-financing. The investment will be carried out from 13.04.2018 to 31.08.2021. The most important stages of implementation are: Preparatory work: 04-07.2018 STAGE 1: competitive selection of contractors: 03-06.2019 STAGE 2: construction works related to the thermal modernisation of the production building complex: 07-11.2019 STAGE 3: heat exchange construction works: 07-08.2021 STAGE 4: ex post energy audit: 08.2021 The project meets the assumptions set out in the SZOOP RPO WIM. As a result of the planned work of purely retrofitting projects, the final energy consumption of the facility will be reduced by 54.29 % per annum, a reduction in thermal energy consumption by 58.09 % per annum and a 5.58 % reduction in electricity consumption per year. As a consequence, greenhouse gas emissions of CO2 into the atmosphere will also be significantly reduced (by more than 60 % per year). Project address: ul. Bolesław the Brave 5, Reszel; Plot No 35/15, perimeter 1 (English)