No label defined (Q132899)

From EU Knowledge Graph
Revision as of 16:20, 21 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    352,151.65 zloty
    0 references
    84,516.40 Euro
    13 January 2020
    0 references
    424,330.22 zloty
    0 references
    101,839.25 Euro
    13 January 2020
    0 references
    82.99 percent
    0 references
    1 March 2018
    0 references
    31 July 2019
    0 references
    POWIAT OSTRÓDZKI
    0 references

    53°54'43.2"N, 19°55'40.8"E
    0 references

    53°42'10.1"N, 19°57'46.4"E
    0 references
    Projekt zakłada dostosowanie obecnej, nieadekwatnej do potrzeb interesariuszy przyszkolnej infrastruktury sportowej w 3 szkołach na poziomie ponadgimnazjalnym dla których Powiat Ostródzki stanowi organ prowadzący. tj.LO NR II W ZSZ IM.S.PETOFI W OSTRÓDZIE, LO NR I w ZSZiO i PORADNI PSYCH– PEDAG. W MORĄGU, LO NR II IM. L.KRUCZKOWSKIEGO W ZSL W MORĄGU.Proj.realizowany będzie na terenie miasta Ostróda oraz miasta Morąg w powiecie ostródzkim. Zakres rzeczowy proj.zgodny z analizą wariantów, diagnozą oraz analizą potrzeb interesariuszy to: Modernizacja i remont sali gimn.wraz z zapleczem sanitarnym w LO nr 2 w ZSZ im. S. Petofi w Ostródzie roboty rozbiórkowe i przyg. renowacja nawierzchni Sali wymiana stolarki drzwiowej tynki i okładziny wym.oświetlenia wym.urządzeń sanitarnych Modernizacja i remont sali gimn. w LO nr I w ZSZiO i Poradni Psych.– Pedag.w Morągu roboty ziemne, fundamentowe i izolacje posadzki i ściany zewn. dach roboty wykończ. i zewn. elewacje wymiana sufitu podwiesz. Remont i modernizacja infrastruktury sportowej w LO w ZSL w Morągu Sala gimn.: roboty rozbiórkowe i przyg. stolarka drzwiowa tynki, posadzki i okładziny wym.oświetlenia wymiana urządzeń sanit. Boisko: roboty rozbiórkowe i przyg. wykonan.nawierzchni sportowej wykonan.nawierzchni trawiastej wykonanie odwodnienia trakt pieszy montaż siedzisk Powyższe remonty zostaną uzupełnione o zakup wyposażenia sportowego. W proj. zostaną także zrealizowane takie zadania jak: promocja proj.,nadzór inwestorski oraz zarządzanie cyklem proj. Zostanie powołany zespół proj.Stosowane będzie prawo PZP oraz klauzule społeczne. Cele proj.są zgodne z SZOOP RPO WiM, Oś 9 Dostęp do wysokiej jakości usług publicznych,Działanie 9.3 Infrastruktura edukacyjna, Poddziałanie 9.3.4 Infrastruktura edukacji ogólnokształcącej. Proj.przyczyni się do podniesienia jakości kształcenia w placówkach nim objętych w związku z tym wpisuje się w założenia osi i działania. (Polish)
    0 references
    The project involves adapting the current, inadequate to the needs of stakeholders at school sports infrastructure in 3 schools at upper secondary level for which the Orodzki District is the leading body. i.e.LO NR II in the ZSZ IM.S.PETOFI W Ostróda, LO NR I in the USSR and the PSYCH- PEDAG clinic. In Morąg, LO NR II IM.L.KRUCZKOWSKI IN ZSL IN MORĄG.The project will be carried out in the city of Ostróda and the town of Morąg in the district of Ostorodzki. The material scope of the project in accordance with the analysis of options, diagnosis and analysis of the needs of stakeholders are: Modernisation and renovation of the gym room together with the sanitary facilities in LO No. 2 in ZSZ im. S. Petofi in Ostróda demolition works and nag. renovation of the floor surface replacement of the door carpentry of plaster and linings e.g. ceilings of the floor and flooring. sanitary equipment. Modernisation and renovation of the gym. in LO No. I in ZSZiO and Poradni Psych. Renovation and modernisation of sports infrastructure in LO in ZSL in Morąg gymnasium: demolition works and fixtures door carpentry plasters, floors and linings, etc. illumination of sanitary equipment. The field: demolition works and performances of sports surface made of grass surface execution of dehydration pedestrian seat assembly The above renovations will be supplemented by the purchase of sports equipment. The project will also carry out tasks such as: promotion of the project, investor supervision and management of the project cycle. The project team will be set up.The law of the Polish People’s Party and social clauses will be applied. The project objectives are consistent with SZOOP RPO WiM, Axis 9 Access to high quality public services, Action 9.3 Education infrastructure, Submeasure 9.3.4 General education infrastructure. The project will contribute to improving the quality of education in the institutions covered by it, therefore, in line with the objectives of the axis and activities. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.09.03.04-28-0008/17
    0 references